BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Santa Ana, California. Completed plans call for site work for a water / sewer project.

As of 11/22/2021 An exact date has not been selected but it is anticipated to start in mid to late January 2022 and end in Spring of 2024. As of 11/19/2021 Project has been awarded but the Award information currently not available. Response Format Electronic and Paper Project Type Bid Response Types Line Items Proposal Documents Ownership Affidavit (Notary Public) - REQ Original Hard Copy Submittal in Addition Bid Bond Guaranty (Notary Public) - REQ Original Hard Copy Submittal in Addition Non-Collusion Affidavit (Notary Public) - REQ Original Hard Copy Submittal in Addition Type of Award Lump Sum License Requirements Class "A" or "C34" Contractor's license Liquidated Damages $1,300.00 Project Duration 450 Working Days Pre-Bid Meeting No Online Q&A Yes Q&A Deadline 10/12/2021 4:00 PM (PDT) The work of these three projects is precipitated by Caltrans State Route 55 widening project. The additional freeway lines being added impact the City of Santa Anas existing pressure reducing station and associated piping. The scope of work has been divided in three components; the relocation of the water main within Ritchey Street, the relocation of the pressure reducing station and the relocation of the connecting piping that currently crosses the freeway. The scope of each project is further defined below: Ritchey St Water Main Relocation, Project No. 19-6438: This work is for the relocation of the existing 16-inch water main in Ritchey Street. Approximately 260 feet will be new 8-inch DR14 C900 PVC pipe connecting to the existing water system on the west side and at Newport Circle, and about 1,444 feet will be new 16-inch DR18 C905 PVC pipe, and about 120 feet of new 16-inch Class 250 DIP to replace the existing piping within Ritchey Street within the limits noted on the Plans. The proposed water main will reconnect existing commercial services, construct new fire hydrants, and reconnect existing fire department connections as well as all connections to the existing water system. This work will also include construction of concrete encasement for thrust restraint, installation of a 16-inch line stop, abandoning the existing 16-inch water main, potholing of crossing utilities and points of connection, establishing traffic control during construction, repaving the roadway and restriping new pavement. SA-7 Pressure Reducing Station Relocation, Project No. 19-6439: This work is for the relocation of the existing SA-7 Pressure Reducing Station. The proposed station will be an above ground station located upon a concrete slab surrounded by an 8-foot high block wall with a rolling gate entrance to the site. Portions of the main line header and discharge piping will be buried and encased in concrete for thrust restraint. The piping and valves for the pressure reducing component of the station will be above ground. The pipe and valves have varying diameter sizes, including 8-inch, 10-inch, 14-inch, 16-inch and 24-inch. The new work includes installing an energy dissipater for discharging waters from the station. This discharge line will be temporarily connected to the existing 21-inch storm drain at the existing SA-7 site until the final work is completed by Caltrans for the new storm drain within the Freeway widening project. The work also includes a new antenna pole, electrical equipment, lighting, instrumentation and controls. There will be a portion of this work that will be phased since the block wall on the side of the freeway cannot be installed until the storm drain culvert for State Route 55 Widening Project is installed. In the interim a chain link fence will be installed. Once the installation of the storm drain culvert is completed, the chain link fence will be removed, and the Phase 2 site construction, including the 8-foot high block wall, will be constructed to complete the site work. Demolition and removal of the above ground existing station components is included in this work. SR-55 Water Crossing Relocation, Project No. 19-6440: This work is for the bore and jack installation of two new transmission mains across the Costa Mesa Freeway (State Route 55) and the partial removal and abandonment of the existing transmission mains. The new mains include 249 LF of 12-inch Class 350 DI carrier pipe within a 30-inch steel casing and 249 LF of 24-inch steel carrier pipe within a 42-inch steel casing. The crossing will also include fiber optic conduits within the casing for future use. The existing carrier pipes and casing crossing the freeway will be slurry filled and abandoned in place. This work also includes: the construction of new 12-inch piping on both sides of the freeway (about 77 feet of 12" Class 350 DIP and 102 feet of 12-inch DR 14 PVC pipe); and the construction of the new 24-inch piping on the east side of the freeway (about 137 feet of 24-inch CML&C steel pipe). The scope includes the construction of the jacking and receiving pits (excavation, shoring, backfill and compaction), removal and replacement of existing 21-inch storm drain on the east side of the freeway, valves, fittings, concrete encasements for thrust restraint, concrete anchor blocks, potholing of crossing utilities and points of connections, connection to existing water mains, the abandonment of the 12-inch and 24-inch piping on the east side of Other Details Please send the original bid bond, as well as the notarized affidavits, enclosed in a sealed envelope and marked clearly with following information, formatted exactly as below: "SEALED BID BOND FOR PROJECT NOs.: 19-6438, 19-6439 & 19-6440 Ritchey St Water Main Relocation; SA-7 Pressure Reducing Station Relocation & SR-55 Water Crossing Relocation City of Santa Ana Attn.: Ricardo Perez Public Works Agency; M-36 P.O. Box 1988 Santa Ana, CA 92702" It is recommended to opt for method with tracking mechanism for delivery. However, these documents are being used for verification and must exactly match scanned electronic versions that will already have been submitted by bid deadline (electronically). For hard copy drop offs at/or before 1pm, visitors must show photo ID at Ross Annex Reception Desk to be sent up to the 3rd floor for delivery at CIP Engineering. After 1pm, visitors must check in at City Hall Reception Desk for drop off.

Bid Results

Water / Sewer

$4,490,370.00

Public - City

Site Work

Subscribe For Documents

98 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
551
Active Projects
243
Bidding Soon
3,997
All Active Projects
1,850
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 19, 2021

December 20, 2021

img_map_placeholder

Multiple Locations, Santa Ana, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.