Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published November 16, 2021 at 7:00 PM
Updated October 1, 2024
Site work and new construction of a mixed-use development in Corpus Christi, Texas. Completed plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; and sidewalk / parking lot.
As of 11/16/21, per the owner a Design-Builder has not been selected. An estimated timeframe for award is January 2022. The City is seeking qualified firms interested and qualified to provide Design/Build services for a turnkey solution which includes all required administration, design, permitting, construction, testing and commissioning efforts to construct a new elevated bathroom, associated parking lot and public park amenities for Surfside Park located in North Beach City of Corpus Christi, Texas. The design build Project at North Beach is an improvement project for Surfside Park. The Project includes the design of a raised restroom facility to be relocated from the current restroom location. In addition, traffic flow and parking layout are to be redesigned relocated and constructed. As part of the overall project, there will be a new community recreation area and picnicking areas integrated into the site and some drainage improvements This park renovation project has four major areas of focus: restrooms, drainage, recreation, and parking. For the proposed restrooms, goals include a raised structure, relocating the restrooms farther back from the beach, and an updated design to address safety concerns. Drainage improvements are concerned with improving the high tide and storm conditions. Proposed recreation elements include a space for play and picnic tables including shade structures all with beach access. All features (restrooms, play area, etc.) will be accessible to park users in a pedestrian friendly and safe manor. Lastly, parking and traffic flow will be addressed to provide a drop off area and a new directional parking pattern which will be located farther back from the beach with updated drainage facilities. B. The Design/Builder shall provide for a turnkey project which includes all required site survey, building permit acquisition, utility relocations, design, site development and construction of all improvements required for the project. C. The completion date for the full design and build of the Project is twelve (12) months from the issuance of the notice to proceed.
Post-Bid
Sidewalks / Parking Lot
$1,800,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 29, 2021
January 17, 2022
3826 Surfside Blvd, Corpus Christi, TX
Related To This Project
Corpus Christi, TX
--
Corpus Christi, TX
Bid Date: Jul 09 2019
Corpus Christi, TX
Bid Date: May 29 2024
Corpus Christi, TX
--
Corpus Christi, TX
Bid Date: May 15 2024
Corpus Christi, TX
Bid Date: May 23 2024
Corpus Christi, TX
--
Corpus Christi, TX
Bid Date: May 29 2024
Corpus Christi, TX
Bid Date: Sep 21 2021
Corpus Christi, TX
Bid Date: Nov 11 2021
Corpus Christi, TX
Bid Date: May 23 2024
Corpus Christi, TX
--
Corpus Christi, TX
Bid Date: Jun 04 2024
Corpus Christi, TX
Bid Date: May 21 2024
Corpus Christi, TX
Bid Date: Nov 18 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
![](https://projects.constructconnect.com/hubfs/science-bokeh2%20(1).webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.