BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a water / sewer project in Corpus Christi, Texas. Completed plans call for the renovation of a 117,045-square-foot water / sewer project.

Scope of work generally consists of replacing the roof for approximately 117,045 SF at Cargo Dock 15. Bidder agrees to furnish all labor, materials, and equipment to install a new 60 Mil TPO roof system with new insulation and new 60 Mil fully adhered TPO membrane roofing. This is a lump sum contract. Bidder must submit a bid bond or cashier's check for 5% of the total amount of the bid. Performance and Payment Bonds are required when the successful bidder executes this contract, each for 100% of the total contract amount. CLARIFICATION DEADLINE :5/13/2024 5:00 PM All questions shall be answered, and the data provided shall be comprehensive. If necessary, questions may be answered on separate attached sheets. Do not attach general advertising and marketing literature; non-relative materials will not be considered as part of the Bid. PCCA reserves the right to accept or reject any or all bids received. PREVAILING WAGE RATE. In accordance with Texas Government Code Chapter 2258, Contractors are required to pay wage rates not less than the general prevailing rate for work of a similar character in the locality in which the work is performed. Contractors shall refer to wage rates established by the U.S. Department of Labor (DOL) in accordance with Davis Bacon Act. LIQUIDATED DAMAGES. Unless specified otherwise in the Special Conditions, liquidated damages of $1,000 will be assessed against Contractor for each Calendar Day beyond the required completion time that the Project is not substantially complete. Unless stated in the Special Conditions, there is no provision for early completion compensation QUANTITIES AND MEASUREMENTS. Actual measured or computed length, area, solid content, number, and weight only will be considered, unless otherwise specifically provided. No extra or customary measurements of any kind will be allowed.

Award

Water / Sewer

$1,602,800.00

Public - Federal

Renovation

7

47

8

7

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
8
Bidding Soon
211
All Active Projects
92
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

June 24, 2024

img_map_placeholder

905 Harbor Dr, Corpus Christi, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.