BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Brunswick, Missouri. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

(1): Job J1P3270 Route 24 CHARITON County. Bridge Deck Replacement over Palmer Creek 0.4 mile west of Rte. MM near Brunswick, the total length of improvement being 0.175 miles. (2): Job J1S3218 Route M MERCER County. Bridge Replacement over Little Muddy Creek, 2.6 miles east of Rte. 65 near Mercer, the total length of improvement being 0.031 miles. (3): Job J1S3263 Route TT CHARITON County. Bridge Deck Replacement over Turkey Creek 1.1 miles east of Rte. 139 near Sumner, the total length of improvement being 0.078 miles. (4): Job J2S0502 Route 129 CHARITON County. Bridge Deck Replacement over Chariton River 0.5 mile south of Rte. O near Salisbury, the total length of improvement being 0.092 miles. Range: : $1M to $2.5M Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - A02 - Bridge Deck Replacement, Bridge Replacement *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$2,736,998.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

160

19

10

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
30
Bidding Soon
404
All Active Projects
175
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2021

December 6, 2021

img_map_placeholder

Multiple Locations, Brunswick, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.