BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 15, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Tacoma, Washington. Completed plans call for site work for a water / sewer project.

Project was awarded to ROAD CONSTRUCTION NORTHWEST INC. with awarded amount $ 245042.48 Scope of Work: The Work required for this Project includes: Installation of sheet pile bulkhead to stabilize select area ofthe upper bank of the Hylebos Creek above the mean higher high water (MHHW) mark. Work will include site regrading and restoration. Bid Estimate: Estimated cost range is $113,000 to $130,000, plus Washington State Sales Tax (WSST). The work is located at: 3701 Taylor Way Tacoma, WA 98421 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions will not be accepted after close of business (COB) on August 30, 2021.

Award

Water / Sewer

$245,042.00

Public - City

Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
98
Bidding Soon
1,488
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2021

October 18, 2021

Project location map

3701 Taylor Way, Tacoma, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.