BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in San Diego, California. Completed plans call for site work for a educational facility; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The project is composed of Make-Ready work, road realignment, an 1,800 stall Parking Structure, 50 stalls of below grade parking under First Ave. (Spine), an Outpatient Pavilion, demolition of the existing Bachman Parking Structure, and a Central Utility Plant (CUP). It is anticipated that this project will contain multiple components with phased plan reviews for various phases of the project, as well as various entities and agencies requiring review and permitting. The 254,000 sf Outpatient Pavilion (OPP) will be designed and constructed as an OSHPD 3- compliant outpatient and clinic facility licensed pursuant to the Health and Safety Code Sections 1200 and 1250. This proposed outpatient and clinic facility will provide services and programs to support the Hillcrest Campus UC San Diego Health System. This facility will serve as a platform to improve outpatient care delivery at UCSD by housing disease-specific centers, including Cancer Care, and consolidating all outpatient, ancillary, professional and support services needed to treat specified conditions. 1,800 Stall Parking Structure The Project will include the design of an 1,800 stall Parking Structure. The structure will be approximately 3 levels below grade and 7 levels above grade. 50 Stall Below-Grade Parking Structure with First Ave. Roadway Above (Spine) The Project will include the improvement and further development of an existing roadway, to create a new road (First Ave.) with 50 below-grade parking stalls and two levels of drop off for the OPP. Make-Ready Work & Road Improvements The Project will include the realignment of Bachman Drive, and the widening of Arbor Drive. Utility infrastructure improvements and relocations will be included, along with safe-off and demolition of various buildings within the project boundaries. Demolition of Bachman Parking Structure & Central Utility Plant (CUP) The Project will include the demolition of the existing Bachman Parking Structure to make room for a new 2-story CUP (non-OSHPD). The CUP will serve the OPP, as well as a future Research Building. Project duration is 1,217 calendar days. The University has bid and awarded a CM at Risk Contract to DPR Construction (hereafter "CM/Contractor"). CM/Contractor is responsible for bidding and awarding all subsequent subcontractor packages, including these packages. Confidentiality of the information provided will be respected to the extent permitted by law. Response to the Request for Proposal (RFP) must be submitted on the forms contained within the RFP documents available from DPR Construction. All information requested in these forms must be provided in order to be considered "responsive" to the requirements of the best value RFP.

Under Construction

Roads / Highways

$547,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
250
Active Projects
123
Bidding Soon
1,572
All Active Projects
749
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 16, 2021

October 18, 2021

img_map_placeholder

200 W Arbor Dr, San Diego, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.