BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Los Angeles, California. Completed plans call for the renovation of a municipal facility.

As of September 17, 2024, project is still in the procurement phase. A timeline for construction has not yet been determined by Owner and Construction Manager. The Hall of Administration Base Isolation Seismic retrofit project consists of the installation of seismic isolators under the foundation of the existing building. Hydraulic jacks and temporary load-bearing shoring will be installed in phases to support and transfer the gravity loads from the existing columns/walls to new support foundations. Seismic strengthening of the superstructure using new concrete shear walls is required at selective locations. A moat gap will be constructed around the building perimeter using earth-retention walls. Shoring and earthwork operations will require demolition and reconstruction of the existing site around the building. The M/E/P scope consist of adjustments, alterations, temporary offsets, and new replacements to accommodate for the new structural systems and seismic movement of the building. All underground utilities will be modified with flexible connections where the utility lines pass through the perimeter moat gap. This project will be performed at an active site where the building is occupied during typical work hours. Temporary provisions of various sorts will be accommodated so as not to disrupt the occupants of the building. From original solicitation. SPECS 7741; C.P. 87599 The Solicitation Title: Construction Manager at Risk Pre-Construction and Construction Services for the Kenneth Hahn Hall of Administration Base Isolation Seismic Retrofit Los Angeles County Public Works is requesting proposals from qualified firms to provide Construction Manager at Risk Pre-Construction and Construction Services for the Los Angeles County (County) Kenneth Hahn Hall of Administration Base Isolation Seismic Retrofit Project, located at 500 West Temple Street, Los Angeles, California. The Project scope consists of a seismic retrofit that will utilize base isolation retrofit technique,

Award

Municipal

$270,000,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

31

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
121
Bidding Soon
2,171
All Active Projects
1,012
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2021

January 6, 2025

img_map_placeholder

500 W Temple St, Los Angeles, CA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.