Published October 6, 2022 at 8:00 PM

Updated October 24, 2023

Site work and renovation of a water / sewer project in Moreno Valley, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Engineer's Estimated Cost: $35,000,000 to $40,000,000. The owner has determined a prequalified list of general contractors. Moreno Valley Raw Water Reclamation Facility Plant 2B Equipping, Centrate, and Flow Diversion Project Questions Due Date: Aug 12th 2022, 5:00 PM PDT Intent to Bid Due Date: Sep 1st 2022, 9:30 AM PDT Questions: Specific questions regarding the Project or the prequalification process shall be emailed to Scott Lopian, Sr. Construction Administrator lopians@emwd.org no later than September 3, 2021 by 5:00 p.m. Notification of Prequalification Status: October 7, 2021 Bonding Estimate: $20 Million Project Location: 17140 Kitching Street, Moreno Valley, CA 92551 MINIMUM QUALIFICATION REQUIREMENTS: Addendum #1 has been issued as of 7-8-2022. General Contractors must demonstrate the satisfactory completion, as a prime general engineering contractor, of at least three (3) similar projects within the last ten (10) years of wastewater treatment facilities as follows: A. Contract Type: Public Works B. Construction Type: Wastewater Treatment Facility Expansion or Modification C. Dollar value: $15 million or greater D. Materials and equipment: Modifications to or construction of aeration systems General Contractors failing to meet these minimum requirements will be rejected and will not be prequalified. In addition, each General Contractor will be evaluated utilizing the factors listed on the prequalification rating chart made a part of this package. All General Contractors submitting the prequalification form must be licensed in the state of California, at the time the prequalification forms are submitted to DISTRICT, with the following licenses and certifications: Class A - General Engineering Contractor General Contractors who fail to meet the license classifications and certification listed above will not be considered for prequalification. The advertisement of the Notice Inviting Bids for the MVRWRF Plant 2B Equipping, Centrate, and Flow Diversion Project is anticipated to occur first quarter of 2022. The Project construction duration is anticipated to be around 730 to 800 calendar days. The preliminary bonding estimate for the project is $20 Million COORD. 49B16 I.D. 19 SA. 32 Addendum #1-#9 have been issued as of 8-30-2022.

Award

Water / Sewer

$40,129,713.00

Public - County

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
3
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2022

October 31, 2022

Project location map

17140 Kitching St, Moreno Valley, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.