BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Moreno Valley, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Engineer's Estimated Cost: $35,000,000 to $40,000,000. The owner has determined a prequalified list of general contractors. Moreno Valley Raw Water Reclamation Facility Plant 2B Equipping, Centrate, and Flow Diversion Project Questions Due Date: Aug 12th 2022, 5:00 PM PDT Intent to Bid Due Date: Sep 1st 2022, 9:30 AM PDT Questions: Specific questions regarding the Project or the prequalification process shall be emailed to Scott Lopian, Sr. Construction Administrator lopians@emwd.org no later than September 3, 2021 by 5:00 p.m. Notification of Prequalification Status: October 7, 2021 Bonding Estimate: $20 Million Project Location: 17140 Kitching Street, Moreno Valley, CA 92551 MINIMUM QUALIFICATION REQUIREMENTS: Addendum #1 has been issued as of 7-8-2022. General Contractors must demonstrate the satisfactory completion, as a prime general engineering contractor, of at least three (3) similar projects within the last ten (10) years of wastewater treatment facilities as follows: A. Contract Type: Public Works B. Construction Type: Wastewater Treatment Facility Expansion or Modification C. Dollar value: $15 million or greater D. Materials and equipment: Modifications to or construction of aeration systems General Contractors failing to meet these minimum requirements will be rejected and will not be prequalified. In addition, each General Contractor will be evaluated utilizing the factors listed on the prequalification rating chart made a part of this package. All General Contractors submitting the prequalification form must be licensed in the state of California, at the time the prequalification forms are submitted to DISTRICT, with the following licenses and certifications: Class A - General Engineering Contractor General Contractors who fail to meet the license classifications and certification listed above will not be considered for prequalification. The advertisement of the Notice Inviting Bids for the MVRWRF Plant 2B Equipping, Centrate, and Flow Diversion Project is anticipated to occur first quarter of 2022. The Project construction duration is anticipated to be around 730 to 800 calendar days. The preliminary bonding estimate for the project is $20 Million COORD. 49B16 I.D. 19 SA. 32 Addendum #1-#9 have been issued as of 8-30-2022.

Award

Water / Sewer

$40,129,713.00

Public - County

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
483
Active Projects
230
Bidding Soon
3,676
All Active Projects
1,659
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 1, 2022

October 31, 2022

April 18, 2025

img_map_placeholder

17140 Kitching St, Moreno Valley, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.