BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 21, 2021 at 8:00 PM

Updated September 15, 2023

Demolition, site work and new construction of a transportation facility in Manchester, New Hampshire. Completed plans call for the demolition of a transportation facility; for the construction of a transportation facility; and for site work for a transportation facility.

**As of October 21, 2021, the project has not been awarded yet. A timeline for award is not yet determined. The City of Manchester, NH, Department of Aviation is seeking bids for the future Air Cargo Facility site preparation and existing building demolition work at Manchester-Boston Regional Airport (MHT). The Owner reserves the right to waive any informality in the bidding or to reject any or all bids. 3-33-0011-XXX-2021 The City of Manchester, New Hampshire, Department of Aviation is seeking bids for the future Air Cargo Facility site preparation and existing building demolition work at Manchester-Boston Regional Airport (MHT). MHT is undertaking an Air Cargo Facility Development Program using a phased approach. This project's phase of the Air Cargo Facility Development Program will be the Cargo Building Area Site Preparation and includes the following components: relocation of secure airfield perimeter fencing, reconfiguring site access fence and gates to the development area from Green Drive, removal of two (2) underground storage tanks near Hangar 6 previously "closed" and accepted by NHDES, Hangar 6 Building Demolition including any minor amounts of hazardous materials, Hangar 7 Building Demolition including any minor amounts of hazardous materials, disconnection of existing utility servicesto existing hangar building, removal of existing site utilities (water, sewer, drainage, & electrical within and surrounding the proposed Air Cargo Building footprint to an existing structure or new point of termination, protection of existing site utilities (overhead and underground electric supply, MHT/FAA cabling, telephone/communication, drainage, water, sewer, and natural gas) to remain in service through the duration of the demolition work and have these site utilities available for future use, restoration of demolition and utility removal areas with a stabilized material, reclaim base course a portion of the existing pavement, removal of existing access control gates areas, installation of temporary access road, relocation of dumpster/compactor pad location and associated modifications, and all other incidental items for the Air Cargo Facility site preparation. Manchester Boston Regional Airport - Airport Administration Offices, Terminal Building 3 rd Floor, 1 Airport Road, Manchester NH 03103

Bid Results

Transportation Terminals

$719,415.00

Public - City

Demolition, New Construction, Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
501
Active Projects
271
Bidding Soon
3,775
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2021

November 22, 2021

Project location map

1 Airport Rd, Manchester, NH


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.