BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and outdoor lighting for a mixed-use development in Orange, California. Conceptual plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; road / highway; and road / highway.

Currently, there are a total of 54 light poles providing area/pathway lighting for Grijalva Park (side A). The lighting was designed with metal poles mounted on concrete foundations at ground level. Deterioration near the base of these poles has resulted in the need to replace several light poles in past years. In spite of past measures taken to protect the poles, deterioration continues due to the effects of corrosion. Several light poles have now been removed, including two which came down during heavy winds. Nine poles in total have been removed due to safety concerns and all others are being evaluated regularly. The objective of this project is to replace all of the area lighting to include new poles and fixtures, designed to resist the corrosive impacts of irrigation water, dog urine, and other factors. This project will require a photo-metrics study prior to an open bid process. Additionally, this project will be partially funded through the Per Capita Allocation program funded through Prop 68. All questions, requests for clarification, and comments shall be sent to the City by Email, and must be clearly titled Written Questions. All such emails shall be sent to Ashlie Valencia at commservbids@cityoforange.org *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Playgrounds / Parks / Athletic Fields

$282,686.00

Public - City

Outdoor Lighting, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
111
Bidding Soon
2,379
All Active Projects
1,061
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.