BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 22, 2021 at 8:00 PM

Updated February 9, 2024

Site work for a road / highway in Mobile, Alabama. Completed plans call for site work for a road / highway.

Damages must be assessed by the ASPA at the rate of $3,000 per day for each calendar day beyond the maximum allowed 28 days per crane. This amount shall be deducted from the amount owed to the bidder. Bidders must plan for four days of rain in their schedule. If rain exceed four days, liquidated damages will not be assessed for those additional days of rain. Please direct technical inquires to Larry Butts @ (251) 441-1911. The Alabama State Port Authority reserves the right to reject any and all bids.

Post-Bid

Roads / Highways

$300,000.00

Public - State/Provincial

Site Work

10

3

4

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
68
Bidding Soon
770
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2021

October 7, 2021

Project location map

To Be Determined, Mobile, AL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.