Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a bridge / tunnel in Cumberland, Wisconsin. Conceptual plans call for site work for a bridge / tunnel.
As of January 10, 2022, this project is in the conceptual phase. An engineer has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to August 2022. *The closed solicitation has been included below for reference: Solicitation ID: NW-06 County : Barron County Limit : Beaver Dam Lake C-03-1459 Anticipated Construction Cost: $1,000,000-$1,999,999 The structure needs to be replaced. Rehabilitation project 0.154 miles to remove and replace structure (C-03-1459) at Beaver Dam Lake on USH 63, City of Cumberland, in Barron County. Two existing box culverts will be removed. The new structure will accommodate recreational traffic including larger watercraft through and ATV passage over the structure. Other work includes structure roadway approach construction. Bureau of Structures is developing the structure plans. Advertised Fixed Fee %: 7.25 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interviews will not be conducted The method of contractor selection has not been determined at this time. Wis DOT - RFP Engineering - C Cumberland, Superior Avenue *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Conceptual
Bridges / Tunnels
$2,000,000.00
Public - State/Provincial
Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 15, 2022
US-63, Cumberland, WI
Related To This Project
Cumberland, WI
Bid Date: Jul 08 2021
Cumberland, WI
Bid Date: Oct 02 2023
Cumberland, WI
Bid Date: Feb 13 2024
Cumberland, WI
--
Cumberland, WI
Bid Date: May 16 2024
Cumberland, WI
--
Cumberland, WI
--
Cumberland, WI
Bid Date: Nov 12 2024
Cumberland, WI
Bid Date: Aug 21 2023
Cumberland, WI
Bid Date: Aug 21 2023
Cumberland, WI
Bid Date: Aug 03 2023
Cumberland, WI
Bid Date: Aug 01 2023
Cumberland, WI
Bid Date: Apr 27 2023
Cumberland, WI
Bid Date: Apr 20 2023
Cumberland, WI
Bid Date: Aug 04 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.