EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 24, 2023 at 8:00 PM

Updated January 26, 2024

Site work and outdoor lighting for a transportation facility in Cumberland, Wisconsin. Completed plans call for outdoor lighting for a transportation facility.

DBE Goal: 3.79% Contract Completion Time: 30 Working Days This contract is federally funded with an established DBE goal, dollar values will not be shown until after the 24-hour supplemental information timeline has expired for DBE documentation submission and bid responsiveness has been determined by the Department. Bids determined to be non-responsive will not have results posted. Bids will be unsealed (electronically opened) as provided above and will be publicly read. The bid opening will be broadcast live via Teams. The correct meeting and call-in information for the bid opening is: Microsoft Teams meeting Join on your computer, mobile app or room device Click here to join the meeting Or call in (audio only) +1 608-571-2209,,105343418# United States, Madison Phone Conference ID: 105 343 418# A bid security in the amount of 5% of the total amount of the bid is required for the contract. Each proposal must be accompanied by a bid bond, certificate of annual bid bond, a certified check, bank's draft, bank's check, or postal money order made payable to the Wisconsin Department of Transportation Secretary for 5% of the total amount bid. The electronic template will allow the following options for meeting the proposal guaranty. E-Verify bid bond (Surety2000 & SurePath), uploading a copy of the bid bond or certificate of annual bid bond, certified check, bank draft, or money order. Any bid security, other than a E-verified bond or certificate of annual bid bond is provided, the department will require that the apparent two lowest bidders to mail or hand-deliver the original bond, certified check, bank draft, or money order to the Bureau of Aeronautics by close of business two business days following the close of bids and must be received by the Bureau of Aeronautics no later than 5 days from the posting of the bid results. Qualification of bidders: IMPORTANT: A paper hard copy prequalification is required to be submitted PRIOR to the bid opening. The proper prequalification form must be sent to the DOT to establish prequalification and remain valid prior to the deadline for prequalification indicated below. Prequalifications submitted after the deadline will be processed but a bid from that firm will not be opened for any project where the deadline has been exceeded. If your firm does not already hold a valid WisDOT highways prequalification and you do not expect to bid WisDOT highways projects in the future, please complete the simplified Bureau of Aeronautics short form. Bid proposals will be opened only from those firms that have established their qualifications for the work being bid upon. If a prospective bidder has previously submitted a current and valid (not expired or revoked), proper statement and received prior approval from the department, a re-submittal for this project is not required. The qualification statement is a sworn statement and consist of information relating to financial ability, equipment, and experience in the work prescribed in this proposal. The statement shall be in writing on the proper standard form furnished by the department. The department will evaluate the statement and determine acceptability prior to bid acceptance. Failure to establish prequalification as stipulated will result in the bid not being opened and/or rejected. Federal Requirements: This project is federally funded and federal provisions and requirements apply. Federal provisions made part of, but not limited to this contract include: Buy American Preference, Federal Tax Certification, Foreign Trade Restriction, Davis Bacon, Affirmative Action, Governmentwide Debarment and Suspension, Governmentwide Requirements for Drug-free Workplace Hours of labor and minimum wage rates: Pursuant to regulations provided by applicable federal and/or state laws, the hours of labor and minimum wage rates are set forth in the proposal. Affirmative action: The department hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award. Affidavit of non-collusion: A required affidavit of non-collusion will be incorporated as part of the proposal for each prospective bidder. Failure to complete and sign the sworn statement makes the bid nonresponsive and ineligible for award consideration. By completing the electronic signature and submitting the proposal, each bidder by or on behalf of the person, firm, association, or corporation submitting the bid, certifiesthatsuch person, firm, association, or corporation has not, either directly or indirectly, entered into agreement, participated in any collusion, or otherwise taken any action, in restraint of free competitive bidding in connection with the submitted bid. This sworn statement shall be executed and sworn to by the bidder before a person who is authorized by the laws of the state to administer oaths. For further information, contact Brad Volker of Cooper Engineering at 715-234-7008, email bvolker@cooperengineering.net

Award

Transportation Terminals

$512,815.00

Public - State/Provincial

Outdoor Lighting, Site Work

37

5

9

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Closeout Submittals, Spare Parts
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 26 - Electrical

Division 26 - Electrical

Electrical, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
49
Bidding Soon
842
All Active Projects
309
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2023

May 22, 2023

img_map_placeholder

865 21st Ave, Cumberland, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.