BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 17, 2021 at 8:00 PM

Updated February 8, 2024

Site work and new construction of an educational facility in Milwaukee, Wisconsin. Completed plans call for the construction of a educational facility.

This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general the work consists of a replacement building for the existing Chemistry Building. The new building will include 92,329 ASF/163,391 GSF that will house instructional and research laboratories and associated support spaces, offices, and shared collaboration/informal learning space and general assignment classrooms. The project also extends the campus utilities to the building site. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. Bid Result. FIRE PROTECTION :Blair Fire Protection $935,094.00 PLUMBING: Butters-Fetting Co., Inc. $3,998,000.00 HVAC: Butters-Fetting Co., Inc. $14,076,000.00 ELECTRICAL:Pieper Electric, Inc $10,165,225.00

Bid Results

Educational

$28,239,225.00

Public - State/Provincial

New Construction, Site Work

793

51

140

9

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
277
Active Projects
145
Bidding Soon
1,859
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2021

December 6, 2021

Project location map

2000 E Kenwood Blvd, Milwaukee, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.