Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 5, 2021 at 8:00 PM
Updated May 31, 2024
Demolition, site work and new construction of a civil project in Dayton, Nevada. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.
HSE#2920 This project includes the construction of approximately 101 linear feet of 15-inch gravity sewer main, 5,236 linear feet of 12-inch sewer force main, offsite sewer forcemain improvements, construction of a new lift station facility and abandonment of an existing lift station facility along Dayton Valley Road in Dayton, Nevada. Sewer gravity and force main shall be installed utilizing open trench construction methods and pavement rehabilitation/restoration. The Contractor will have 210 calendar days to complete the Work in compliance with all applicable laws and regulations. Project is partially funded through SRF. The Engineer's Opinion of Probable Construction Costs of the project is between $3,800,000 to $4,500,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. For questions regarding this project, and for complete contract requirements, contact: Jared Trowbridge, P.E.; (775) 851-4788; Farr West Engineering; 5510 Longley Lane; Reno, Nevada 89511; jared@farrwestengineering.com.
Bid Results
Water / Sewer
$3,616,560.00
Public - County
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 28, 2021
November 29, 2021
Dayton Valley Rd, Dayton, NV
Related To This Project
Dayton, NV
Bid Date: Mar 14 2024
Dayton, NV
Bid Date: May 17 2024
Dayton, NV
Bid Date: Mar 14 2025
Dayton, NV
--
Dayton, NV
Bid Date: Feb 23 2023
Dayton, NV
Bid Date: Jan 17 2023
Dayton, NV
--
Dayton, NV
Bid Date: Jun 28 2021
Dayton, NV
Bid Date: Jun 10 2021
Dayton, NV
Bid Date: Apr 26 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
