BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a municipal facility in Fremont, California. Completed plans call for the renovation of a municipal facility.

Location and Description. The Project is located at 40000 Paseo Padre Parkway, Fremont, CA and is described as follows: The work includes demolish and properly recycle existing sanitary sewer lift station with concrete sump, pumps, motors, supports, pump controller and control devices. Remove existing power service back to existing electrical panel. Remove concrete pad area, portion of the asphalt paving, and fencing. Excavate portion of the landscape area for new concrete pad. Install new lift station with fiberglass sump, duplex submersible pumps, pump controller and control devices. Install new electrical supply to pump controller and new exterior lighting to the area, concrete pad, asphalt paving, new double gate and fencing around the new area. And all necessary work in the drawings and specifications provided. Time for Completion : The planned timeframe for commencement and completion of construction of the Project is: Ninety (90) calendar days from the date specified in the Notice to Proceed to Final Completion. Estimated Project Cost : The estimated construction cost, or construction cost range, for the Project is $300,000. This estimate serves only as a guideline to bidders of the scope of the Work and the Project. No bidder, including the successful bidder, is entitled to make any claim against City based on inaccuracy of the estimated cost or range of cost of the Work or the Project. The Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents. The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price.

Award

Municipal

$234,744.00

Public - City

Renovation

14

17

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
83
Bidding Soon
1,734
All Active Projects
744
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2021

October 21, 2021

img_map_placeholder

40000 Paseo Padre Pkwy, Fremont, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.