BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction and addition to a library in Bloomfield, Connecticut. Working plans call for the addition of a 28,000-square-foot library; for the demolition of a library; for site work for a library; and for the construction of a library.

As of August 18, 2023, construction has not started. Construction is likely to start at the end of September 2023. No trades have been awarded. *The closed solicitation has been included below for reference: TOWN OF BLOOMFIELD REQUEST FOR PROPOSALS #1107 CONSTRUCTION MANAGEMENT SERVICES FOR BLOOMFIELD PUBLIC LIBRARY FACILITIES The Town of Bloomfield is soliciting proposals from qualified Construction Managers at Risk for the purpose of construction management services for a new Prosser Library and addition and renovation of McMahon Wintonbury Library. All Construction Manager firms submitting proposals must be pre-qualified as a Construction Manager at Risk (Group B) as defined in the CT DAS Contractor Classification List. Submittal requirements may be found on the Town's website, www.bloomfieldct.gov. All responses must be received by 1:00 PM on September 10, 2021 to be considered. Approval of funding in the amount of $29,255,000 for this project is scheduled for referendum in November 2021. Estimated construction budget is approximately $23.4 million. The goal of the Town is to a) demolish the existing 20,200 sq. ft. Prosser Library, and replacing it with a new facility of approximately 28,000 SF on the same parcel, housing the same occupants, plus new parking on the adjoining (former lumber yard) property with a connecting bridge/walkway over Wash Brook, and b) renovate the existing 6,023 sq.ft. P. Faith McMahon Wintonbury Library along with a new addition of approximately 2,895 sq. ft. Schematic Design Phase 11/5/21-3/1/22 Design Development Phase 3/1/22-6/1/22 Construction Documents Phase 6/1/22-9/15/22 Bidding Phase 9/15/22-10/31/22 Construction 11/1/22-4/30/24 Construction Manager Services will commence after the November 2021 referendum subject to its approval. The selected Construction Manager shall provide performance and payment bond letter from the surety in the amount of 100% of the contract price.

Pre-Construction/Negotiated

Library

$23,400,000.00

Public - City

Addition, Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
443
Active Projects
255
Bidding Soon
3,904
All Active Projects
1,678
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2021

September 25, 2023

img_map_placeholder

Multiple Locations, Bloomfield, CT

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.