EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 14, 2021 at 8:00 PM

Updated October 1, 2024

Site work for a road / highway in Elk Grove Village, Illinois. Completed plans call for site work for a road / highway.

INSTALLATION OF EROSION CONTROL MEASURES, REMOVAL OF EXISTING A JACKS SYSTEM, EARTHWORK, GABION PLACEMENT, LEDGE ROCK INSTALLATION AND GENERAL SITE RESTORATION. Est. Completion Date: Oct. 29, 2021 It is the intent of the plans and specifications to demonstrate the material quality and location of installation. It is the responsibility of the Bidder to determine exact material sizes and methods of installation required to complete and turn over to the owner in first class condition the improvements. The work is generally described as follows: Construction of tiered ledge rock to stabilize the stream bank along a portion of Salt Creek in Elk Grove Village, IL.

Bid Results

Roads / Highways

$157,910.00

Public - City

Site Work

10

4

2

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Examination and Preparation, Construction Layout
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting

Find More Local Projects

Within 75 Miles of This Project
243
Active Projects
152
Bidding Soon
2,539
All Active Projects
1,061
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2021

October 4, 2021

img_map_placeholder

Multiple Locations, Elk Grove Village, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2021 Salt Creek Stabilization Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.