BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fontana, California. Completed plans call for site work for a water / sewer project.

19-053GP-R4 All requests for information/clarifications must be submitted, in writing, to Marycruz Perez, Senior Buyer, via email at perema@fusd.net and received no later than 12:00 p.m. on September 9, 2021. Please direct all correspondence with the subject line, Bid No. 21/22-1595i Retention Basin at Sierra Lakes . No other questions or requests for information will be accepted after this date and time. Each bidder shall be a licensed contractor pursuant to the California Business and Professions Code and be licensed to perform the work called for in the contract documents. The successful bidder must possess a valid and active A or B license at time of bid and license must be valid through project completion. The Contractor's California State License number shall be clearly stated on the Bid Form. Subcontractors shall be licensed pursuant to California law for the trades necessary to perform the work called for in the contract documents and license must be valid through project completion. Each bid must strictly conform with and be responsive to the contract documents as defined in the General Conditions. The DISTRICT reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding. Separate payment and performance bonds, each in an amount equal to 100% of the total contract amount, are required, and shall be provided to the DISTRICT prior to execution of the contract and shall be in the form set forth in the contract documents. All bonds (Bid, Performance, and Payment) must be issued by a California admitted surety as defined in California Code of Civil Procedure Section 995.120. Contractor to: o Grade basin per plans and indicated elevations, o Provide and install Jordan trench drain model # V7383 or equivalent, o Provide and install 2 - 12" x 12" inlet frame and grate per plan, o Provide and install 1 - 12" x 12" bubble up emitter, o Repair and reconfigure irrigation, due to excavation, o Install approximately 160' X 611 schedule 40 pvc, o Patch concrete in around new trench drain, o Export base removed from trench drain, o Export soil excavated from basin, o Hydro seed excavated areas, o Provide erosion control as per plans, and o Saw cut at V drain for inlet, if necessary.

Award

Water / Sewer

$90,000.00

Public - City

Site Work

4

3

2

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
116
Bidding Soon
2,164
All Active Projects
1,007
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2021

October 18, 2021

img_map_placeholder

5740 Avenal Pl, Fontana, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.