EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 4, 2021 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Norco, California. Completed plans call for site work for a water / sewer project.

The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Contract Documents, Specifications and Plans for the above stated project. The general items of work to be done hereunder consist of construction of installing approximately 3,670 linear feet of new 8" Ductile Iron (DI) waterline within Sunset Court and Shadow Canyon Circle between Norco Drive and Norco Drive. This proposed waterline will replace the existing 6" water main within this reach on Sunset Court and Shadow Canyon Circle. Construction of waterline shall include the water main, fire hydrants, service connections, mainline interconnec ts, bends, valves, blow - offs, air - vacs and any other necessary appurtenances and related work to the satisfaction and acceptance of the City Engineer. There are 45 working days allowed to complete this project. Liquidated damages shall be assessed at $1000.00 per working day. Any Contract entered into pursuant to this notice will incorporate the provisions of the State Labor Code. Compliance with the prevailing rates of wages, apprenticeship employment standards, and Contractor registration program established by the State Director of Industrial Relations will be required. Affirmative action to ensure against discrimination in employment practices on the basis of race, color, national origin, ancestry, sex, or religion will be also required. The Contract Documents call for monthly progress paymen ts based upon the engineer's estimate of the items of work completed. The AGENCY will retain 5 percent of each progress payment as security for completion of the balance of the work. At the request and expense of the successful Bidder, the City of Norco will pay the amounts so retained upon compliance with the requirements of Government Code Section 4590 and the provisions of the Contract Documents pertaining to Substitution of Securities. Bids must be prepared on the approved proposal forms in conformance with the Instructions to Bidders and submitted in a sealed envelope plainly marked on the outside: "SEALED BID FOR SUNSET COURT AND SHADOW CANYON CIRCLE WATERLINE PROJECT. DO NOT OPEN WITH REGULAR MAIL." No Contractor or Sub-Contractor may be listed on proposal unless they are registered with the Department of Industrial Relations (DIR) pursuant to Labor Code Section 1725.5. The AGENCY reserves the right to reject any or all bids, to waive any irregularity, to accept any bid or portion thereof, and to take all bids under advisement for a period of 45 days. At the time of Contract award, the prime Contractor shall possess an appropriate Contractor's License sufficient to perform the work. Prior to execution of the Contract, the Contractor will be required to submit two good and sufficient bonds each in the amount of 100 percent of the Contract price, and to satisfactorily provide evidence of insurance as described elsewhere in these Specifications. This contract is subject to state contract nondiscrimination and compliance requirements pursuant to Government Code Section 12990.

Award

Water / Sewer

$980,955.00

Public - City

Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
261
Active Projects
151
Bidding Soon
2,422
All Active Projects
968
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2021

October 22, 2021

img_map_placeholder

Sunset Ct & Shadow Canyon Cir, Norco, CA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Sunset Court and Shadow Canyon Circle Waterline Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.