Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 5, 2021 at 8:00 PM
Updated November 15, 2023
Renovation of a military facility in Madison, Wisconsin. Completed plans call for the renovation of a 58,000-square-foot military facility.
This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders In general, the work consists of Directional drilling a new 10 inch water service to the building, installing sprinkler and high-expansion foam fire suppression systems in an approximate 58,000 square foot aircraft hangar building. Other work involved will include installation of of fire pumps, construction of a fire suppression equipment room within the existing building mechanical space, upgrading the existing fire alarm system, installing a new building service served by a new transformer and adding supplementary structural steel framing to support the new fire suppression systems. Part of the work of this project will need to be coordinated with the work of a separate project that will construct two small additions for hangar doors concurrent with the work of this project. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. bid result fire protection H.J. Pertzborn Plumbing & Fire Protection $1,632,000.00 plumbing H.J. Pertzborn Plumbing & Fire Protection $7,358.00 electrical Forward Electric $518,212.00
Award
Military
$2,157,570.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 5, 2021
November 5, 2021
1952 Pearson St, Madison, WI
Related To This Project
Madison, WI
Bid Date: Aug 26 2021
Madison, WI
Bid Date: Aug 04 2021
Madison, WI
Bid Date: Aug 24 2021
Madison, WI
Bid Date: Jun 22 2021
Madison, WI
Bid Date: Sep 07 2021
Madison, WI
Bid Date: Sep 21 2021
Madison, WI
Bid Date: Jun 10 2021
Madison, WI
Bid Date: Apr 22 2021
Madison, WI
Bid Date: Nov 02 2021
Madison, WI
Bid Date: Oct 07 2021
Madison, WI
Bid Date: Nov 02 2021
Madison, WI
Bid Date: Oct 19 2021
Madison, WI
Bid Date: Dec 16 2021
Madison, WI
Bid Date: Dec 07 2021
Madison, WI
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
