BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction, remodeling, renovation and addition to a mixed-use development in Elma, New York. Completed plans call for the addition of a educational facility; and for the remodel of a educational facility.

SCOPE INCLUDES : Asbestos Abatement; Lead Paint Removal; Selective Demolition; Site Concrete; Concrete Forming & Accessories; Concrete Reinforcing; Cast-In-place Concrete; Concrete Repair Material; Unit Masonry; Manufactured Masonry Veneer; Structural Steel Framing; Steel Decking; Cold-Formed Metal Framing; Rough Carpentry; Solid Surface Fabrications; Foamed-In-Place Insulation; Roofing; Penetration Firestopping; Joint Sealants; Hollow Metal Doors & Frames; Flush Woods Doors; FRP Doors; Coiling Counter Doors; Door Hardware & Accessories; Glazing; Fire-Resistant Glazing; Gypsum Board Shaft Wall Assemblies; Non-Structural Metal Framing; Gypsum Board; Porcelain Tile; Ceramic Tiling; Acoustical Panel Ceilings; Resilient Base & Accessories; Resilient Tile Flooring; Epoxy Terrazzo; Painting; Visual Display Units; Phenolic-Core Toilet Partitions; Misc. Items; Fire Protection Cabinets; Fire Extinguishers; Metal Lockers; Laminate Clad Casework Laboratory; Safety Wall Pads; Roller Window Shades WAGE = Prevailing Wage PRC# 2021002465 TAX = Tax Exempt SCHEDULE = All work shall be completed on 1st shift during the summer months. All Work Iroquois High School, Iroquois Middle School, Iroquois Intermediate School & New Press Box complete by November 18, 2022 All Work Elma Primary School, Marilla Primary School & Wales Primary School complete by November 23, 2023 Iroquois High School Project Control Number: 14-13-01-06-0-007-024 Iroquois Middle School Project Control Number: 14-13-01-06-0-002-023 Iroquois Intermediate School Project Control Number: 14-13-01-06-0-004-014 Elma Primary School Project Control Number: 14-13-01-06-0-001-012 Marilla Primary School Project Control Number: 14-13-01-06-0-005-018 Wales Primary School Project Control Number: 14-13-01-06-0-003-019 *Addendum No. 01, 02, 03, 04 and 05 have been released.

Award

Educational

$573,600.00

Public - City

Addition, Demolition, New Construction, Remodeling, Renovation, Site Work

152

30

19

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
92
Bidding Soon
2,386
All Active Projects
1,031
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.