Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 22, 2025 at 8:00 PM
Updated March 23, 2025
Site work and paving for a road / highway in Pearland, Texas. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
UPDATE :Continuous development in the City has resulted in changes to traffic patterns and counts. Intersections are encountering increased traffic flows more than they were originally constructed to handle resulting in increasing congestion and.. Project is in City of Pearland capital budget fy 2025-CIP ___________________________________________________________________________ Continuous development in the City has resulted in changes to traffic patterns and counts. Intersections are encountering increased traffic flows more than they were originally constructed to handle resulting in increasing congestion and heightened safety concerns. The rapidly changing traffic patterns has resulted in a "reactive" effort aimed at modifying intersection geometry or signalization to address these conditions as they occur. The 2015 Traffic Management Plan identifies short term intersection improvements throughout the city. Pearland Parkway at Barry Rose Rd dual left turn lanes and dedicated right turn lanes in 2023-2024 will be installed to increase traffic volume capacity to improve the traffic intersection level of service. This project is included in the city’s fy 2025-2028 Capital Improvement Program. As of January 9, 2025, further details regarding construction and completion timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$1,520,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2026
Barry Rose Rd & Pearland Pkwy, Pearland, TX
Related To This Project
Pearland, TX
Bid Date: Nov 02 2023
Pearland, TX
Bid Date: Dec 21 2023
Pearland, TX
Bid Date: May 08 2025
Pearland, TX
Bid Date: Jun 20 2023
Pearland, TX
Bid Date: Mar 05 2024
Pearland, TX
Bid Date: Dec 15 2022
Pearland, TX
--
Pearland, TX
--
Pearland, TX
Bid Date: Dec 14 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
