BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Indianapolis, Indiana. Completed plans call for the construction of a transportation facility; for site work for a transportation facility; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

https://www.insideindianabusiness.com/articles/indygo-purple-line-construction-coming-soon INDIANAPOLIS - The IndyGo Board of Directors is set to vote on the approval of construction contracts for the Purple Line Thursday, marking the official kick off for Indianapolis's second bus rapid transit line after the Red Line. Attempts at the Statehouse to derail the Purple Line for the past two years haven't stopped plans for the construction along 38th Street. The new $187 million line will connect downtown Indy and Lawrence through east side neighborhoods that have long been neglected. Federal funding will cover $81 million of the costs. IndyGo Director of Communications Carrie Black said about half of the budget is going to improve infrastructure. "So this is going to mean new sidewalks, paving, storm sewer separation, a multi use path," Black said. The contracts will be awarded to two companies that will build out the corridor including dedicated bus lines and stations with new technology. The existing route along 38th St is already one of IndyGo's most heavily traveled routes. Many areas along 38th Street have crumbling or missing sidewalks as well as damaged, dangerous crossings Black said this type of investment is a win for the community, even for people who don't ride the bus. "When you put in bus rapid transit like this and when you improve a community, that also drives economic development and more jobs and more opportunities," Black said. Some investment is already happening in the area including the Cook Medical project at 38th Street and Sheridan Avenue. Utility work is already underway along parts of 38th Street. Major construction will begin in the spring of 2022 with buses up and running by 2024. __________________________________________________________ Indianapolis Public Transportation Corporation (IPTC) Invitation for Bid (IFB) 21-05-385 Purple Line Bus Rapid Transit Construction Project IndyGo is seeking bids from qualified Contractors for construction services needed to support the Indianapolis Public Transportation Corporation (IndyGo) Purple Line Bus Rapid Transit (BRT) Project. The Purple Line project includes construction of 18 new stations, new exclusive bus lanes, separated storm sewer, sidewalks and paths, pavement resurfacing, traffic signals, and drainage improvements. The scope of work assumes a 29-month construction duration and up to two bid packages for construction. Questions Due /Round 1 September 23, 2021 by 4:00pm (EST). Answers Posted / Round 1 September 30, 2021 (Posted electronically ) Questions Due /Round 2 October 7, 2021 by 4:00pm (EST). Answers Posted/Round 2 October 14, 2021 (Posted on electronically) IPTC Board Meeting December 2, 2021 at 5:00pm / Public Meeting. Please provide proof of publication with invoice. This ad should be standard legal ad size in black ink only. No color (s). Billing Information: AccountsPayable@IndyGo.net or IPTC Accounts Payable 1501 W. Washington Street Indianapolis, IN 46222 1. DBE Participation Goal for Package A: 13 % 2. DBE Participation Goal for Package B: 5% 3. DBE Participation Goal for Package A+B: 11.5 %

Post-Bid

Transportation Terminals

$20,000,000.00

Public - State/Provincial

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

112 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
97
Bidding Soon
967
All Active Projects
456
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 28, 2021

December 27, 2021

img_map_placeholder

9301 E 59th St, Indianapolis, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.