BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 29, 2021 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Norristown, Pennsylvania. Completed plans call for site work for a water / sewer project.

Project drawings and documents are available for inspection at the offices of the Municipality of Norristown. MUNICIPALITY OF NORRISTOWN RAPP ALLEY STORM WATER IMPROVEMENTS 2021 CDBG GRANT The Scope of Work: installation of storm pipe and inlets, regrading a portion of the existing alley, repaving alley and existing trench in roadway and associated lawn restoration. Bids must be submitted unconditionally. No bidder may withdraw a bid within SIXTY (60) days after the scheduled closing time for receipt of bids. The Municipality reserves the right to waive any informalities, or to reject any or all bids. All prospective bidders are hereby notified that this project is subject to Section 3 of the Housing and Urban Development Act of 1968, as amended, which requires, to the extent feasible, contractors to employ lower income residents of the project area and to purchase materials from local businesses. If you are qualified Section 3 business, you will, upon written request to the Owner be supplied the name of the successful Bidder in order to facilitate your ability to make your services known. The Bidders attention is called to the fact that this project is receiving funds under Title 1 of the Housing and Community Development Act of 1974, as amended and as such, the Davis-Bacon Act applies to this Contract and that the successful Bidder shall pay no less than the Federal Wage Rates determined for the project area as set forth on the Contract Documents. Bonds are required to be issued by a surety licensed to do business in the Commonwealth of Pennsylvania. Requests for clarification are due Monday, September 20, 2021 12:00:00 PM [(UTC-05:00) Eastern Time (US & Canada)] LOCATION: THE PROJECT SITE IS LOCATED ALOGN RAPP ALLEY & EAST OAK STREET IN NORRISTOWN BOROUGH, MONTGOMERY COUNTY, PA. The undersigned agrees to furnish all labor, materials and equipment to construct and complete temporary restoration within 60 consecutive calendar days, after the notice to proceed. Each Contractor shall furnish a surety bond in an amount to 100 percent of the contract for faithful PERFORMANCE; a separate surety bond in an amount equal to 100 percent of the contract for the payment of LABOR and MATERIALS; and a separate MAINTENANCE bond in an amount equal to 25% of the total contract price up to $200,000 Estimated Project Cost: $65,000 to $75,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$133,283.00

Public - City

Site Work

3

13

2

6

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
855
Active Projects
177
Bidding Soon
6,413
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2021

October 15, 2021

Project location map

601 DeKalb St, Norristown, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.