BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 24, 2021 at 8:00 PM

Updated April 6, 2024

Site work and paving for a mixed-use development in Wisconsin Dells, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

All planholders will receive information via Quest on how to join the virtual meeting prior to the bid opening. The work for which bids are asked includes the following: Replacement of approximately 550 feet of City utilities, reconstruction of approximately 550 centerline feet of urban roadway, traffic control, existing surface removals, excavation and roadway grading, sanitary sewer, water main, storm sewer, colored concrete pavement, concrete pavement, concrete curb and gutter, concrete flatwork, temporary pavement, asphat paving, pavement markings, signing and all related restoration items. The anticipated substantial completion date is May 27, 2022 and final completion date is July 1, 2022 Please contact QuestCDN.com at 952-233-1632 or info@questcdn.com for assistance in free membership registration, downloading, and working with the digital project information. BIDDER is required to deliver the original certified check or bid bond within the 72 hours of bid opening to MSA Professional Services, Inc., Attn: Brandan Hager, 1230 South Boulevard, Baraboo, WI 53913. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. OWNER reserves the right to waive any informalities or to reject any or all bids. Published by the authority of the City Of Wisconsin Dells. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff. The project consists of the reconstruction of Elm Street. We understand the proposed reconstruction will include installing new sanitary sewer, water main, and storm sewer followed by grading and constructing a new urban roadway profile with curt) and gutter. The sanitary sewer and water main is planned to be installed between approximately 7 to 10 feet below the proposed finished roadway grade. The storm sewer is planned io be instated at approximately 3to feet below the proposed finished roadway grade. The proposed reconstruction will include some minor adjustments (outs/fite) to the existing finished roadway grade. We assume the new roadway section will consist of hot-mix asphalt (HMA) pavement over base course similar to the existing roadway section

Award

Roads / Highways

$747,395.00

Public - City

Paving, Site Work

39

14

2

7

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
108
Bidding Soon
804
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2021

October 18, 2021

Project location map

Elm St, Wisconsin Dells, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.