Published October 27, 2022 at 8:00 PM

Updated January 25, 2024

Site work and new construction of a fitness / recreation center in Reno, Nevada. Completed plans call for the construction of a fitness / recreation center; and for site work for a fitness / recreation center.

*As of October 2022, a construction manager has been awarded. The City of Reno is soliciting proposals from Construction Companies for Construction Manager at Risk (CMAR) services for the Moana Springs Community Aquatic and Fitness Center in southwest Reno. The construction project includes, but is not limited to, the construction of a new community aquatic and fitness center on an existing City of Reno park parcel. The Moana Springs Community Aquatic and Fitness Center shall include three pools, a mezzanine level fitness area, two multipurpose rooms, locker rooms, restrooms, offices, and other auxiliary facility support rooms. Site improvements may include the construction of a new parking lot with improved site access and circulation, playground park relocation, utility relocation, other ancillary site work. The scope of this project includes, but is not limited to, the construction of a new community aquatic and fitness center on an existing City of Reno park parcel (APN: 024-013-06 - West Moana Lane & Baker Lane). The Moana Springs Community Aquatic and Fitness Center shall include three pools (one 35 meter or 50 meter indoor deep water competition pool depending on available funding, one indoor multipurpose recreation pool, and one outdoor heated pool), a mezzanine level fitness area, two multipurpose rooms, locker rooms, restrooms, offices, and other auxiliary facility support rooms. Geothermal heating for the pools to be provided by a third party from a deep well that is remotely located on the parcel. Site improvements shall include the construction of a new parking lot with improved site access and circulation, playground park relocation, utility relocation, other ancillary site work, and the protection and preservation of select existing trees. Construction Begins: October 2022 Construction Ends: December 2023 Project Location(s): APN: 024-013-06 (West Moana Ln & Baker Lane) The construction cost is estimated at approximately $22,000,000 to $28,000,000. The CMAR will provide the required pre-construction and construction services. Preconstruction services shall include assisting the design team with constructability matters, construction cost, value engineering, fast track options and scheduling. The construction services shall include determining a Guaranteed Maximum Price (GMP), procurement of all subcontractor contracts, and managing construction of the project. The construction project includes, but is not limited to, the construction of a new community aquatic and fitness center on an existing City of Reno park parcel. The Moana Springs Community Aquatic and Fitness Center shall include three pools, a mezzanine level fitness area, two multipurpose rooms, locker rooms, restrooms, offices, and other auxiliary facility support rooms. Site improvements may include the construction of a new parking lot with improved site access and circulation, playground park relocation, utility relocation, other ancillary site work. Contractors seeking to submit a proposal must have a representative attend the mandatory pre-submittal conference to be eligible to submit a proposal for the project. Paper copies of these documents may be examined at the City of Reno, Capital Projects office at City Hall, One E. First Street, 8th Floor, Reno, Nevada 89501. Some errors in printing have been observed from contractors. Please check your documents to ensure that documents are displaying correctly. If you are unable to access the information via the link provided, please contact Justin George with the Capital Project Division of the Public Works Department at (775)-399-3703. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Q&A Deadline 09/17/2021 4:30 PM (PDT)

Award

Fitness / Rec Centers

$26,500,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
0
Bidding Soon
205
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 28, 2021

March 1, 2023

Project location map

To Be Determined, Reno, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.