Published September 21, 2026 at 8:00 PM
Updated September 29, 2026
Renovation of an educational facility in College Station, Texas. Completed plans call for the renovation of a educational facility.
https://assets.system.tamus.edu/files/fpc/pdf/Subcontracting/Sept2026.pdf 02-3345 Project Description: CUP Generator Replacement Project $26,500,000 Replacement of Steam Turbine Generator 4 along with auxiliary equipment and three cell cooling tower capacity upgrade to sustain growth at Texas A&M University. Delivery Method: Competitive Sealed Proposal Architect/Engineer: Stanley Consultants, Inc. A/E Contact: Brad Schmidt General Contractor: REC Industries Contractor Contact: ScmidtBrad@stanelygroup.com Subcontractor Bidding: Complete DJ Dockery Substantial Completion: January 2027 djdockery@recind.com -------------------------------------------------------------------- https://www.star-telegram.com/news/state/texas/article315947707.html The Texas A&M University System Board of Regents passed the capital plan for Fiscal Years 2027-31 at last week's quarterly meeting in Kingsville, providing funding for 20 construction projects that were in the planning stages. The total funding for the 20 projects is $1.45 billion. Those 20 projects brought the total number of projects in planning, design or construction across the A&M System to 86 projects totaling almost $6.2 billion based on information provided in the regents meeting agenda book. The A&M System has 31 projects in construction totaling $2.5 billion, 20 projects in design totaling $1.1 billion and now 35 projects in planning including the 20 that were approved last week. The 35 projects in planning total $2.4 billion. "The Texas A&M University System is growing because Texas is growing, and this capital plan reflects our responsibility to prepare for the future while preserving what matters most," board Vice Chairman Jay Graham said in a statement following the meeting. "From restoring the historic Academic Building to expanding in Fort Worth and strengthening research and workforce training across Texas, these projects are long-term investments in the students, communities and future of our state." The projects are spread across the state from as far north as Canyon in the panhandle to Brownsville on the Rio Grande. College Station leads the way with 27 projects followed by Bryan with nine. College Station has five projects in construction, eight projects in design and 14 projects in planning including 10 that were first approved last week. "These facilities are more than buildings," Chancellor Glenn Hegar said in a statement. "They are places where students prepare for their futures, where research solves real-world problems and where our universities and agencies serve the people of Texas every day." In College Station, the five projects currently under construction are the Central Utility Plant (CUP) Generator Replacement project; the Clinical Veterinary Teaching and Research Complex; the Aplin Center; the new player development center at Blue Bell Park; and the Meat Sciences and Technology Center. Of the five under construction, the CUP Generator Replacement is closest to completion with a scheduled end date of early January 2027. The player development center at Blue Bell Park is scheduled to be completed by mid-January 2027. Outside of College Station, work continues on the Texas A&M Space Institute in Houston which will have two large training floors designed to replicate the surface of the moon and Mars. Completion of the Space Institute is expected to be this fall. Projects in design at A&M include a new Biology Teaching and Research Building, Satellite Utility Plant 1 expansion, a third building for the Mays Business school and a West Campus learning commons. Plumbing riser replacements for Fowler, Hughes and Schumacher halls are also in the design phase. Renovations that are in the design phase include Building 1041 on the main campus which will house a small-animal gastrointestinal laboratory as well as renovating the first floor of the Medical Sciences Library and the exterior of the Academic Building. The renovation of Building 1041 was added to the design phase at the November 2025 regents meeting. The Academic Building restoration was upgraded to the construction phase at the regents meeting last week with work scheduled to begin in July. Projects in planning for College Station include an $80 million renovation to Olsen Field at Blue Bell Park; $30 million for the HEEP Laboratory Building renovations; $135 million for a vivarium on West campus and an unspecified amount for a vivarium on East campus. Another $220 million is earmarked for an Engineering Education and Research Complex. Other projects in planning for College Station include a new Poultry Sciences center, a parking garage on Discovery Drive, expansion of the cyclotron institute which was approved at the February regents meeting and the VetMed Animal Housing Facility. Other renovation projects in planning at College Station include the second floor of the Medical Sciences Library, sixth floor of the Annex and upgrades to the HVAC on the second floor of the Reynolds Medical Sciences Building. Also in planning is a project to replace the chillers in the Satellite Utility Plant 1. Bryan has two projects in construction, two projects in design and three projects in planning all located at RELLIS. Two projects in construction at RELLIS recently completed construction, the Hypersonic Wind Tunnel and TEEX training complex. The other construction projects at RELLIS still being worked on are the Semiconductor Institute and an extension of Avenue D southward. The Semiconductor Institute is scheduled to be completed in the spring of 2028. Projects in planning at RELLIS are mostly infrastructure projects with the exception of phase two of the Ballistic Aero-Optics and Materials range which has a project cost of $70 million. RELLIS also has two projects in design in the form of the Water Tower and Water Well and the Bush Combat Development Center's new hangar., which was approved for construction by the board last week, a project worth $16.4 million. _____________________________________________________________________________________________________________ https://assets.system.tamus.edu/files/fpc/pdf/Subcontracting/March2026.pdf 02-3345 Project Description: CUP Generator Replacement Project $26,500,000 Replacement of Steam Turbine Generator 4 along with auxiliary equipment and three cell cooling tower capacity upgrade to sustain growth at Texas A&M University. Delivery Method: Competitive Sealed Proposal Architect/Engineer: Stanley Consultants, Inc. A/E Contact: Brad Schmidt General Contractor: REC Industries Contractor Contact: ScmidtBrad@stanelygroup.com Subcontractor Bidding: Complete DJ Dockery Substantial Completion: January 2027 djdockery@recind.com ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ https://assets.system.tamus.edu/files/fpc/pdf/Subcontracting/February2026.pdf 02-3345 CUP Generator Replacement Project Stanley Consultants, Inc. Project Description: Architect/Engineer: Delivery Method: General Contractor: Subcontractor Bidding: Replacement of Steam Turbine Generator 4 along with auxiliary equipment and three cell cooling tower capacity upgrade to sustain growth at Texas A&M University. Competitive Sealed Proposal REC Industries Complete A/E Contact: Brad Schmidt ScmidtBrad@stanelygroup.com Contractor Contact: DJ Dockery djdockery@recind.com Substantial Completion: January 2027 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- https://assets.system.tamus.edu/files/fpc/pdf/Subcontracting/November2025.pdf Stanley Consultants, Inc. Project Description: Architect/Engineer: Delivery Method: General Contractor: Subcontractor Bidding: Replacement of Steam Turbine Generator 4 along with auxiliary equipment and three cell cooling tower capacity upgrade to sustain growth at Texas A&M University. Competitive Sealed Proposal REC Industries Complete A/E Contact: Brad Schmidt ScmidtBrad@stanelygroup.com Contractor Contact: AJ Clouston ajclouston@recind.com Substantial Completion: August 2026 ------------------------------------------------------------------- https://assets.system.tamus.edu/files/fpc/pdf/Subcontracting/October2025.pdf 02-3345 Project Description: CUP Generator Replacement Project $26,408,348 Replacement of Steam Turbine Generator 4 along with auxiliary equipment and three cell cooling tower capacity upgrade to sustain growth at Texas A&M University. Delivery Method: Competitive Sealed Proposal Architect/Engineer: Stanley Consultants, Inc. A/E Contact: Brad Schmidt General Contractor: REC Industries Contractor Contact: ScmidtBrad@stanelygroup.com Subcontractor Bidding: Complete AJ Clouston Substantial Completion: August 2026 ajclouston@recind.com ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ https://assets.system.tamus.edu/files/fpc/pdf/Subcontracting/September2025.pdf 02-3345 CUP Generator Replacement Project Project Description: Replacement of Steam Turbine Generator 4 along with auxiliary equipment and three cell cooling tower capacity upgrade to sustain growth at Texas A&M University. $26,408,348 Delivery Method: Competitive Sealed Proposal Architect/Engineer: Stanley Consultants, Inc. A/E Contact: Brad Schmidt General Contractor: REC Industries Contractor Contact: ScmidtBrad@stanelygroup.com Subcontractor Bidding: Complete AJ Clouston Substantial Completion: August 2026 ajclouston@recind.com ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The Texas A and M University System Office of Facilities Planning and Construction (FP and C) on behalf of the Board of Regents of The Texas A and M University System (Owner) and Texas A and M University are soliciting statements of qualifications for selection of a Design-Build (DB) firm for the Texas A&M CUP Generator Replacement project #02-3345 (Project), in accordance with the terms, conditions, and requirements set forth in the Request for Qualifications. The Central Utility Plant (CUP) uses one gas turbine generator and two steam turbine generators to produce power for the campus. This project includes the replacement/upgrade of the existing 5 MW Steam Turbine Generator 4 (STG004) along with its auxiliary equipment and balance of plant modifications, including a new surface condenser. The Planning Amount for this project is $26,000,000. The Planning Amount includes an Amount Available for Construction Contract (AACC) of $20,375,000. Fees, furnishings, other work, miscellaneous expenses, and contingencies make up the balance of the Planning Amount. The Request for Qualifications (RFQ) is the first step of a two-step selection process for selecting a DesignBuild firm. The RFQ provides the information necessary to prepare and submit Qualifications for consideration by the Owner. The Owner may select up to five (5) of the top ranked qualification respondents to respond to a Request for Proposals. The Central Utility Plant (CUP) uses one gas turbine generator and two steam turbine generators to produce power for the campus. This project includes the replacement/upgrade of the existing 5 MW Steam Turbine Generator 4 (STG004) along with its auxiliary equipment and balance of plant modifications, including a new surface condenser. Scope of work includes: -Demolition and removal of the existing CUP 5 Megawatt Steam Turbine Generator #4 (STG004). Additional STG auxiliary equipment to be removed includes the surface condenser, condensate pumps, and associated piping, electrical wiring and raceway, and controls wiring and raceway Upgrade existing Cooling Towers 41/42/43 with new fill, structural repairs, 3 new fans and new pumps/motors with Variable Frequency Drives. - Install new 5-10 megawatt steam turbine generator and associated equipment at the STG004 location. Building modifications will be required. - Replace existing Boiler 12 feed water pump starter with new 4160 volt Variable Frequency Drive. - Remove existing 1.25 megawatt Emergency Generator at the Central Utility Plant. The Texas A&M University System (TAMUS) has established agency specific goals and therefore respondents are required to use the following: 1. 11.2% for heavy construction other than building contracts; 2. 26.0% for all building construction, including general contractors and operative builders contracts; 3. 11.0% for all special trade construction contracts; 4. 38.0% for professional services contracts; 5. 11.0% for all other services contracts; and 6. 44.0% for commodities contracts. - Install new Emergency Generator (up to 4 megawatt capacity) at the Agronomy Road Substation. The Planning Amount for this project is $26,500,000. The Planning Amount includes an Amount Available for Construction Contract (AACC) of $20,375,000. Fees, furnishings, other work, miscellaneous expenses, and contingencies make up the balance of the Planning Amount. It is the policy of the State of Texas and the A&M System to encourage the use of Historically Underutilized Businesses (HUBs) in our prime contracts, subcontractors, and purchasing transactions. The goal of the HUB program is to promote equal access and equal opportunity in A&M System contracting and purchasing. In the second step of the process, the selected qualification respondents will be required to submit additional information to the Owner through a Request for Proposal. The second step may also include an interview. The Owner will rank the respondents in the order that they provide the "best value" for the Owner based on all information received. Any questions regarding this RFQ shall be directed to: Robert Hartman The Texas A&M University System Office of Facilities Planning & Construction Phone: (979) 458-7086 E-mail: robert.hartman@tamus.edu
Post-Bid
$20,375,000.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2021
May 30, 2022
To Be Determined, College Station, TX
Related To This Project
College Station, TX
Bid Date: Oct 15 2026
College Station, TX
Bid Date: Oct 20 2026
College Station, TX
Bid Date: Sep 30 2026
College Station, TX
Bid Date: Oct 22 2026
College Station, TX
--
College Station, TX
--
College Station, TX
Bid Date: Oct 19 2026
College Station, TX
--
College Station, TX
--
College Station, TX
--
College Station, TX
--
College Station, TX
--
College Station, TX
Bid Date: Oct 21 2026
College Station, TX
Bid Date: Nov 17 2026
College Station, TX
Bid Date: Nov 04 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed