BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of a water / sewer project in Robert Lee, Texas. Completed plans call for the remodel of a water / sewer project.

***As of December 8, 2021, the project has been awarded for the amount of $99,061.49.*** The replacement of Owner's existing metering system with a drive-by AMR meter system, replacement of existing gate valves on distribution lines, and installation of check meters on the existing distribution lines. ESTIMATED COST: Base Bid: $135,000 Alternate #1: $50,000; Alternate #2: $88,000; Alternate #3: $42,000 This contract is contingent upon release of funds from the Texas Water Development Board (TWDB). Any contract or contracts awarded under this Invitation for Bid are expected to be funded in part by financial assistance from the Texas Water Development Board. Neither the State of Texas nor its departments, agencies, or employees are or will be a party to this Advertisement for Bids or any resulting contract. The Owner reserves the right to waive any informalities and to reject any or all bids. In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex (including pregnancy), sexual identity, gender identity, national origin, age (40 or older), disability or genetic information. This contract is subject to the Environmental Protection Agency's (EPA) Disadvantaged Business Enterprise (DBE) Program, which includes EPA-approved fair share goals toward procurement of Minority and Women-owned Business Enterprise (M/WBE) businesses. EPA rules require that applicants and prime contractors make a good faith effort to award a fair share of contracts, subcontracts, and procurements to M/WBEs through demonstration of the six affirmative steps. For more details on the DBE Program and the current, applicable fair share goals, please visit www.twdb.texas.gov/dbe. The current fair share goals for the State of Texas are as follows: CATEGORY MBE WBE CONSTRUCTION 19.44% 9.17% EQUIPMENT 16.28% 11.45% SERVICES 20.41% 13.66% SUPPLIES 25.34% 8.82% Bid Results Base Bid 1 - Core and Main - $64,268.05 Base Bid 2 - Core and Main - $34,793.44

Award

Water / Sewer

$99,061.00

Public - County

Remodeling

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
3
Bidding Soon
125
All Active Projects
53
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 11, 2021

December 13, 2021

img_map_placeholder

Multiple Locations, Robert Lee, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.