BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work and new construction of a water / sewer project in Sunnyvale, California. Conceptual plans call for the demolition of a water / sewer project; and for the construction of a water / sewer project.

Filtration is part of tertiary treatment, which makes wastewater that has undergone primary and secondary treatment clean for discharge. The new Filter Control Building will be updated with electrical equipment, instrumentation, and controls that will be constructed for the tertiary treatment facilities. This project entails replacing the existing facility with a new Filter Control Building. The major project elements include demolition of the existing Filter Control/Lab Building and equipment, installation of temporary supervisory control and data acquisition controls (SCADA), a new filter control building, new electrical equipment (including motor control centers), new instrumentation and controls, and the extension/connection into the upgraded Water Pollution Control Plant (WPCP) SCADA system. Filter Control Building (Includes Demolition of Existing) is Project 3.1 in the Sunnyvale Cleanwater Program Master Plan adopted by City Council in 2016. The engineering design phase of the project starts in FY 2023/24 and ends in FY 2024/25, while the construction phase of the project starts in FY 2025/26 and ends in FY 2026/27. This project is currently in the City of Sunnyvale's FY 2022 - 2023 CIP. Per the owner, as of October 6, 2022, no designer or general contractor has been procured for the project. The owner states that construction is anticipated to begin in 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$5,800,668.00

Public - City

Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
69
Bidding Soon
1,442
All Active Projects
620
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2027

img_map_placeholder

To Be Determined, Sunnyvale, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.