Site work and paving for a transportation facility in Santa Maria, California. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
The work comprises of the following: Airfield safety and security. Surface preparation including sweeping, vegetation removal, and blowing. Removal of existing pavement markings. Slurry seal application Application of one or two coat pavement markings with and without reflective media The type of contractor's license required is Engineering A, or C-32 (Parking & Highway Improvement). Quantities given in the Bid Schedule of the proposal are approximate only, and are given solely for the basis of comparison of bids. The contractor will be paid for actual work accomplished, including materials and equipment actually installed and accepted, at the unit price bid in the appropriate items of the Bid Schedule. The contract award, if made, will be made within thirty (30) days after opening of bids. No bidder may withdraw his bid within said period. The work shall commence within 10 days after receiving a written Notice to Proceed and shall be prosecuted diligently. The work shall be completed within 50 calendar days. The District would like to proceed with this project as soon as possible, however the District recognizes and acknowledges potential challenges with the availability of manpower and materials. As such, the District is prepared to issue a Notice to Proceed at a mutually agreeable date, anytime within six (6) calendar months from award of contract, after the contractor awarded the contract has properly signed the contract documents and furnished the required bonds and insurance policies and certificates. If the Contractor refuses or fails to complete the work within the time specified, including authorized extensions, there shall be deducted from monies due the Contractor, not as a penalty but as liquidated damages, the sum of $500.00 for each calendar day subsequent to the time specified and until the work is completed and accepted up to and including thirty (30) calendar days past the date established for completion. Contractor shall pay to District the sum of $ 1,000.00 per calendar day as liquidated damages for each calendar day that Project shall remain incomplete past thirty (30) calendar days after the date established for completion. The District reserves the right, after opening bids, to reject any or all bids, or to make award to the lowest responsible bidder and reject all other bids, and/or to waive any informalities or irregularities in any bid which it may deem necessary in the best interests of the Santa Maria Public Airport District. Each proposal must be accompanied by a certified or cashier's check, or by a corporate surety bond on the form furnished by the District, as a guarantee that the bidder will, if award is made to it in accordance with the terms of its proposal, promptly secure worker's compensation insurance and liability insurance, execute an agreement in the required form, and furnish satisfactory bonds for faithful performance of the contract and for payment of claims of material suppliers and laborers hereunder. Said check or bid bond shall be in an amount not less than ten percent (10%) of the amount of the bid. The faithful performance bond shall be not less than one hundred percent (100%) of the contract price, and the payment bond shall be not less than one hundred percent (100%) of the contract price. A faithful performance bond and a payment bond are only required for contracts in excess of $25,000 The minimum wages to be paid for labor shall be not less than the general prevailing per diem wage and rates for overtime and general holidays as determined by the Director of the Department of Industrial Relations, State of California, pursuant to California Labor Code Sections 1770, 1773, and 1773.1, which wage rates are available for inspection at the District office. DBE Requirements - This project is funded by the Santa Maria Public Airport District. Bidders shall provide good faith effort documentation of meeting the District DBE participation goal. The DBE goal for this project is 8.75%.
Award
Transportation Terminals
$199,400.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 27, 2021
November 26, 2021
3249 Terminal Dr, Santa Maria, CA
Related To This Project
Santa Maria, CA
--
Santa Maria, CA
Bid Date: Jan 07 2025
Santa Maria, CA
Bid Date: Feb 27 2025
Santa Maria, CA
Bid Date: Dec 17 2024
Santa Maria, CA
Bid Date: Feb 27 2025
Santa Maria, CA
Bid Date: Dec 23 2024
Santa Maria, CA
Bid Date: Jan 09 2025
Santa Maria, CA
--
Santa Maria, CA
Bid Date: Feb 05 2025
Santa Maria, CA
Bid Date: Jan 07 2025
Santa Maria, CA
--
Santa Maria, CA
Bid Date: Feb 04 2021
Santa Maria, CA
Bid Date: Nov 21 2024
Santa Maria, CA
Bid Date: Jan 14 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.