Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 30, 2021 at 7:00 PM

Updated November 14, 2023

Renovation of a water / sewer project in Fairfield, California. Completed plans call for the renovation of a water / sewer project.

Analyze need and design of NBA Pump Station Air Compressor Control System. Remove existing NBA Pump Station Air Compressor Control System and replace with new system Deadline for Submitted of RFP Questions September 20, 2021 Response to RFP Questions September 23, 2021 Contact: Rainier Garcia, WTP Supervisor Public Works - Water Treatment Plant 100 Water Way Benicia, CA 94510 Phone: (707) 746-4393

Award

Water / Sewer

$400,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
519
Active Projects
196
Bidding Soon
3,603
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 27, 2021

October 27, 2021

Project location map

250 Mangels Blvd,, Fairfield, CA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed