Published November 8, 2021 at 7:00 PM

Updated January 26, 2024

Site work and renovation of a civil project in Medford, Oregon. Completed plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.

The Contractor shall provide everything necessary for construction of two (2) separate chemical feed facilities; one located at 8301 Table Rock Rd., Central Point, OR and the other located at 4800 Fish Lake Rd., Butte Falls, OR. These facilities will provide delivery of sodium hydroxide in a controlled fashion to the potable water process at both locations. The Work to be performed under these Contract Documents shall include, but is not limited to: all clearing, grubbing, civil, structural, mechanical, electrical, instrumentation and control, startup, and construction support for delivery of the specified buildings and apparatus. Potential bidders must contact Mark Depner, Purchasing Agent, at mark.depner@medfordwater.org or (541) 774-2459 to be provided a login password. For any questions regarding this Invitation to Bid, contact Andy Huffman, Capital & Special Projects Coordinator at 541-774-2455 or andy.huffman Facsimile (FAX) proposals are not acceptable. This project does not contain asbestos abatement work and the contractor or (any) subcontractor will not be required to be licensed by the Oregon DEQ pursuant to ORS 468A.720. MWC may cancel the procurement or reject for good cause any or all bids in accordance with ORS 279B.100. MWC reserves the right to postpone the award of the contract for a period not to exceed 60 days. The CONTRACTOR shall furnish all necessary machinery, tools, apparatus, materials and labor and to do the said work in the most substantial and workmanlike manner according to the solicitation, general provisions, general specifications and any special provisions hereto attached, and the plans therefore on file in the office of the applicable department of the COMMISSION, and in accordance with such modifications of the same and other directions as may be made by COMMISSION as provided for therein. It is agreed that said plans, specifications and provisions, and the schedule of rates and prices at time of construction as set forth in the solicitation and in the said provisions and specifications are hereby specifically referred to and made a part of this contract and shall have the same force and effect as though all the sums and provisions thereof were fully inserted herein.

Award

Water / Sewer

$8,398,000.00

Public - City

Renovation, Site Work

125

33

24

6

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer?s Field Services, Quality Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Specialty Placed Concrete, Post-Tensioned Concrete, Concrete Curing
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Mortaring, Masonry Grouting, Masonry Anchors, Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Structural Aluminum Framing, Metal Joists, Steel Joist Framing, Metal Decking, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Cementitious and Reactive Waterproofing, Thermal Protection, Roofing and Siding Panels, Metal Roof Panels, Roof and Wall Specialties and Accessories, Roof Accessories, Smoke Vents
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Toilet, Bath, and Laundry Accessories, Exterior Specialties, Protective Covers, Other Specialties
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction, Special Instrumentation
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Vibration and Seismic Controls for Plumbing Piping and Equipment, Identification for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Storm Drainage, Sump Pump Discharge Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Vibration and Seismic Controls for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, HVAC Fans, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Network Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Medium-Voltage Circuit Protection Devices, Medium-Voltage Fuses, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Static Uninterruptible Power Supply, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Chain Link Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Guideways/Railways, Rail Tracks
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Clamps
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
7
Bidding Soon
128
All Active Projects
49
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 19, 2021

December 20, 2021

img_map_placeholder

Multiple Locations, Medford, OR


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Water Quality Improvements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.