Site work for a mixed-use development in Toronto, Ontario. Completed plans call for site work for a transportation facility.
Dev Co Selected for Scarborough Subway Extension Stations, Rail and Systems Contract. Metrolinx and Infrastructure Ontario (IO) have selected Scarborough Transit Connect as the development partner ((known as the "Dev Co") to enter the development phase of the Stations, Rail and Systems (SRS) contract for the Scarborough Subway Extension project. The SRS package for the Scarborough Subway Extension is being delivered using a Progressive Design-Build (PDB) model. Scarborough Transit Connect is comprised of leading companies with the expertise to deliver a subway project: Applicant Leads: Aecon Infrastructure Management Inc., FCC Construccion S.A. Design Prime Team Member: Mott MacDonald Canada Limited Construction Prime Team Members: Aecon Infrastructure Management Inc., FCC Construccion S.A. The scope of work includes: - Design and construction of three new underground stations and bus terminals at each station. - Design and construction of emergency exit buildings and service buildings, and traction power substations. - Installation, testing and commissioning of all systems equipment and interconnection with existing TTC systems. - Design, supply, installation, testing, and commissioning of all rail and track components and a pocket track east of Kennedy Station. - Coordination with the Advance Tunnel contractor on remaining work. The Progressive Design-Build model incorporates a multi-stage design process called a development phase. This phase allows for a collaborative approach between the project owner, the contracting partner and other stakeholders who work closely together to finalize the scope, risk allocation and pricing of various elements of the project. Currently, the development phase for SRS is anticipated to be completed in approximately 18 to 24 months. Once the development phase has concluded, Metrolinx and the Scarborough Transit Connect team will then have the option to sign a final agreement to proceed to the construction phase, which would include agreements on detailed designs and a negotiated price. Scarborough Transit Connect was evaluated and selected based on criteria identified in the Request for Proposals process that began in February 2022. Criteria included design and construction methodology, approach to managing the project, and corporate overhead and profit fees for the project. The open, fair and competitive procurement process was overseen by a third-party fairness monitor. Metrolinx will deliver the 7.8-kilometre Scarborough Subway Extension in two large contracts: the SRS contract and the Advance Tunnel contract, which is currently under construction. The subway will remain publicly owned by the Province of Ontario and will be operated by the TTC as part of Line 2. The Scarborough Subway Extension is one of the five priority transit projects in the Greater Toronto and Hamilton Area. The other projects include the Yonge North Subway Extension, the Eglinton Crosstown West Extension, the Ontario Line and the Hamilton LRT. The scope of work includes: - 7.8 kilometre extension of Line 2 (Bloor-Danforth) subway. - Tunnelling work for the length of the alignment. - Three new stations: Lawrence Avenue and McCowan Road, Scarborough Centre and a terminal station at McCowan Road and Sheppard Avenue. - Emergency Exit Buildings, Traction Power Substations and modifications at Kennedy Station. - Transit connections to Line 2, Line 5 - Eglinton Crosstown LRT, GO train service (Stouffville line) and Durham Region Transit bus service. Three teams were shortlisted and invited to respond to the RFP. The teams and their prime team members are: Dragados: - Applicant Lead: Dragados Canada, Inc. - Design Prime Team Member: AECOM Canada, Ltd. - Construction Prime Team Member: Dragados Canada, Inc. KSX Integrated Design-Builders: - Applicant Leads: Peter Kiewit Sons ULC, SNC-Lavalin Constructors (Pacific) Inc. - Design Prime Team Members: Peter Kiewit Sons ULC, SNC-Lavalin Constructors (Pacific) Inc. - Construction Prime Team Members: Peter Kiewit Sons ULC, SNC-Lavalin Constructors (Pacific) Inc. Scarborough Transit Connect: - Applicant Leads: Aecon Infrastructure Management Inc., FCC Construccion S.A. - Design Prime Team Member: Mott MacDonald Canada Limited - Construction Prime Team Members: Aecon Infrastructure Management Inc., FCC Construccion S.A. Teams will begin preparing proposals that detail how they will deliver the project. Upon evaluating the proposals received, IO and Metrolinx expect to select a development partner who they intend to work collaboratively with during a development phase before finalizing the Design-Build contract. The development phase is expected to start in fall 2022. The 7.8-kilometre Scarborough Subway Extension is being delivered in two large contracts: the SRS package and the advance tunnel contract. The tunnel contract was awarded on May 25, 2021 to Strabag. The Scarborough Subway Extension is one of four priority transit projects announced by the Province in 2019 for the Greater Toronto Area. In May 2021, the Government of Canada announced funding for Ontario's four transit priority projects in the Greater Toronto Area, including the Ontario Line, a three-stop Scarborough Subway Extension, the Yonge North Subway Extension and the Eglinton Crosstown West Extension. Planning is underway for all four subway projects and procurements for the subway program are being staged to ensure each project is delivered successfully.
Award
Transportation Terminals
$800,000,000.00
Public - State/Provincial
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better bids. Win.
The best source for commercial construction data, period. Get instant access to up to five free projects and companies. Subscribe all contacts, documents, and details so that you can find new opportunities and win new business.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
July 1, 2022
January 2, 2023
Multiple Locations, Toronto, ON
Related To This Project
Toronto, ON
--
Toronto, ON
--
Toronto, ON
Bid Date: Jul 20 2022
Toronto, ON
--
Toronto, ON
Bid Date: Dec 01 2022
Toronto, ON
--
Toronto, ON
--
Toronto, ON
--
Toronto, ON
--
Toronto, ON
Bid Date: Jun 10 2022
Toronto, ON
Bid Date: Mar 31 2022
Toronto, ON
Bid Date: Mar 18 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--