Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in San Francisco, California. Completed plans call for the renovation of a municipal facility.
Questions Due Date: December 28, 2021 at 4:00 PM. Intent to Bid Due Date: Jan 19th 2022, 2:00 PM PST SBE (15%) TIME FOR COMPLETION- 210 Days Base A - Work at Pedestrian Bridge: a. Removal of existing coatings, surface preparation, and placement of the new coatings on all steel surfaces of the pedestrian bridge at the Caltrain Bayshore Station at 400 Tunnel Avenue, San Francisco, California 94134: b. Bridge surfaces (interior and exterior) including wall panels at elevators. c. Placement of new coatings on existing clock mountings located at both ends of the pedestrian bridge. d. Provide and furnish all labor, equipment, materials, machinery, facilities, and services necessary to complete the work. e. Removal of all existing bolts and wire mesh panels. f. Temporary detachment and reattachment of existing conduits that are attached to the surfaces in Part 1.01A.1 to allow access to underlying surfaces. g. Solvent cleaning to remove all oil and grease. h. Pressure water washing of all bridge surfaces to remove all surface contamination (salts), dirt and loose paint and rust. i. Surface contamination testing to verify that the pressure water washing has reduced surface contamination levels to below those specified herein. j. Construction of a containment system that permits the use of the bridge, station and train tracks at all times during the surface preparation and painting operations. k. Furnishing an environmental control equipment package to assure the reliable delivery of dry air. It is anticipated that the equipment will only be used when required to meet the ambient conditions required in the specifications and/or by the coating manufacturer. l. Abrasive blasting to remove all existing coatings, rust and mill scale to achieve a surface cleanliness of SSPC SP-10, Near White m. Application of a conventional three-coat inorganic zinc-rich primer, epoxy intermediate, and urethane finish coat system. n. Replacement of wire mesh panels and frames on stair towers and stair guardrails with new wire mesh panels and new frames, connected with stainless steel fasteners. o. Removal of existing wire mesh panels and existing frames, painting frames, reinstallation of painted frames with existing wire mesh panels, connected with new stainless steel fasteners on the pedestrian overpass horizontal walkway. p. Replacement of all bolts, nuts, and attachment hardware with new stainless steel bolts, nuts, and attachment hardware. Fasteners shall be tamper-resistant, including use of tri-groove nuts. q. Repair and touch-up of Contractor-damaged coatings on existing conduit and light standard surfaces. 2. Bid Option B - Work at Stairwells and Elevator Towers (exercisable by the Agency in its sole discretion) a. Removal of existing coatings, surface preparation, and placement of the new coatings on all steel surfaces of the stairwells, and elevator towers at the Caltrain Bayshore Station at 400 Tunnel Avenue, San Francisco, California 94134: b. Stairwell surfaces (interior and exterior) including handrails and stair components. c. Elevator Enclosure (exterior surfaces only). d. Placement of new coatings on existing "BAYSHORE" signage and mounting supports located on top of the elevator towers. e. Provide and furnish all labor, equipment, materials, machinery, facilities, and services necessary to complete the work. f. Removal of all existing bolts and wire mesh panels. g. Temporary detachment and reattachment of existing conduits that are attached to the surfaces in Part 1.01A.1 to allow access to underlying surfaces. h. Solvent cleaning to remove all oil and grease. i. Pressure water washing of all bridge surfaces to remove
Bid Results
Municipal
$2,066,880.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 19, 2022
May 2, 2022
400 Tunnel Ave, San Francisco, CA
Related To This Project
San Francisco, CA
Bid Date: Jan 19 2022
San Francisco, CA
Bid Date: Jan 19 2022
San Francisco, CA
Bid Date: Jan 03 2022
San Francisco, CA
Bid Date: Jan 14 2022
San Francisco, CA
Bid Date: Jan 18 2022
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
Bid Date: Feb 10 2021
San Francisco, CA
Bid Date: Jan 20 2022
San Francisco, CA
Bid Date: Jan 20 2022
San Francisco, CA
Bid Date: Jan 24 2022
San Francisco, CA
Bid Date: Jan 20 2022
San Francisco, CA
Bid Date: Jan 27 2022
San Francisco, CA
--
San Francisco, CA
Bid Date: Jan 27 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.