BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a civil project in Garden Grove, California. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

The Alwood, Anthony & Acacia - Water Improvement Project consists of constructing new 8 and 12-inch PVC pipe to replace undersized 4 and 6-inch AC water mains in Alwood Avenue, Cole Street, Acacia Avenue, and Anthony Avenue. The water improvements consist of approximately 900 feet of 12-inch, 120 feet of 10-inch, and 3,300 feet of 8- inch diameter polyvinyl chloride (PVC) domestic water pipe. It also includes the construction of approximately thirteen (13) hydrant assemblies, one hundred ten (110) water service connections and six (6) connections to existing water mains. The entire project will also require reconstruction of street cross gutters, removal and/or abandonment of the existing water lines and valves, dewatering, maintaining the existing water services during construction, reconstructing and reconnecting of water and fire service connections, traffic control, trench pavement resurfacing, traffic restriping, and installation of raised pavement markers and appurtenant work. Direct ANY and ALL questions to Ms. Rebecca Li, Project Manager, (714) 741- 5562. Engineer's estimate on this project is around $1,800,000 dollars. The security shall be in an amount equal to at least 10 percent of the amount bid. A bid shall not be considered unless one of the forms of bidder's security is enclosed with it. A Surety Bond for payment of Labor and Material in the amount of 100 percent of the estimated total contract price and Faithful Performance Bond in the amount of 100 percent of the total contract price, both prepared on the forms provided, will be required at the time of signing the contract agreement. Upon receipt of the Notice to Proceed, CONTRACTOR agrees to submit shop drawings and traffic control plans within fourteen (14) calendar days. Further, upon receipt of the Notice to Proceed the CONTRACTOR shall diligently prosecute the work to completion within eighty (80) total working days

Award

Water / Sewer

$1,560,288.00

Public - City

Paving, Site Work

11

5

2

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
107
Bidding Soon
2,365
All Active Projects
1,030
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2022

March 14, 2022

img_map_placeholder

Multiple Locations, Garden Grove, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.