BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 4, 2021 at 8:00 PM

Updated January 10, 2026

Site work for a water / sewer project in Smithville, Oklahoma. Completed plans call for site work for a water / sewer project.

As of 11/4/2021 project was already awarded for $422,148.08. For Bear Ridge Subdivision Project includes the furnishing of labor, equipment and materials to construct: Approximately 3,661 LF of 6-inch waterline, 2,272 LF of 4-inch waterline, 7,702 LF of 2-inch waterline, and 1,662 LF of 1"-inch waterline services. project includes furnishing and installing 99 water meters & boxes, casings, 2" flushing hydrant assemblies, combination air release valves, and other appurtenances and incidentals necessary to provide a complete installation. Each Bid must be accompanied by a BID BOND payable to the OWNER for Five Percent (5%) of the total amount of the BID. A certified check may be used in lieu of a BID BOND. PERFORMANCE AND MAINTENANCE AND STATUTORY PAYMENT BONDS in the amount of 100 percent (100%) of the Contract Price, with a corporate surety approved by the OWNER, will be required for the faithful performance of the contract The OWNER may waive any informalities or minor defects or reject any and all BIDS. Any BID may be withdrawn prior to the above scheduled time for the opening of BIDS or authorized postponement thereof. Any BID received after the time and date specified shall not be considered. No BIDDER may withdraw a BID within sixty (60) calendar days following the actual date of the opening thereof. The OWNER reserves the right to: change dates the bid will be considered; waive all informalities; reject any and all bids; choose whether to accept alternates, if applicable; adjust quantities; and add or omit items of work as deemed necessary to conform with budget or other constraints; and to accept that bid deemed most advantageous for value received. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Range is $550,000-$750,000

Award

Water / Sewer

$422,148.00

Public - County

Site Work

16

12

2

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
44
Bidding Soon
311
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2021

November 22, 2021

Project location map

Carter Creek, Smithville, OK


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.