Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 4, 2021 at 8:00 PM
Updated January 10, 2026
Site work for a water / sewer project in Smithville, Oklahoma. Completed plans call for site work for a water / sewer project.
As of 11/4/2021 project was already awarded for $422,148.08. For Bear Ridge Subdivision Project includes the furnishing of labor, equipment and materials to construct: Approximately 3,661 LF of 6-inch waterline, 2,272 LF of 4-inch waterline, 7,702 LF of 2-inch waterline, and 1,662 LF of 1"-inch waterline services. project includes furnishing and installing 99 water meters & boxes, casings, 2" flushing hydrant assemblies, combination air release valves, and other appurtenances and incidentals necessary to provide a complete installation. Each Bid must be accompanied by a BID BOND payable to the OWNER for Five Percent (5%) of the total amount of the BID. A certified check may be used in lieu of a BID BOND. PERFORMANCE AND MAINTENANCE AND STATUTORY PAYMENT BONDS in the amount of 100 percent (100%) of the Contract Price, with a corporate surety approved by the OWNER, will be required for the faithful performance of the contract The OWNER may waive any informalities or minor defects or reject any and all BIDS. Any BID may be withdrawn prior to the above scheduled time for the opening of BIDS or authorized postponement thereof. Any BID received after the time and date specified shall not be considered. No BIDDER may withdraw a BID within sixty (60) calendar days following the actual date of the opening thereof. The OWNER reserves the right to: change dates the bid will be considered; waive all informalities; reject any and all bids; choose whether to accept alternates, if applicable; adjust quantities; and add or omit items of work as deemed necessary to conform with budget or other constraints; and to accept that bid deemed most advantageous for value received. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Range is $550,000-$750,000
Award
Water / Sewer
$422,148.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 21, 2021
November 22, 2021
Carter Creek, Smithville, OK
Related To This Project
Smithville, OK
Bid Date: Dec 09 2025
Smithville, OK
Bid Date: Jan 23 2025
Smithville, OK
Bid Date: Aug 16 2024
Smithville, OK
Bid Date: Mar 17 2022
Smithville, OK
Bid Date: Nov 29 2022
Smithville, OK
Bid Date: Sep 21 2022
Ada, OK
Bid Date: Jan 12 2026
Rush Springs, OK
Bid Date: Jan 29 2026
Oklahoma City, OK
Bid Date: Jan 08 2026
Tribbey, OK
Bid Date: Jan 26 2026
Hobart, OK
Bid Date: Jan 14 2026
Madill, OK
Bid Date: Jan 30 2026
Cherokee, OK
Bid Date: Jan 29 2026
Bromide, OK
Bid Date: Feb 05 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
