BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 1, 2021 at 8:00 PM

Updated November 21, 2024

Renovation of an educational facility in Salt Lake City, Utah. Completed plans call for the renovation of a educational facility.

Scope of Work : Existing 6 stop elevator modernization in the Henry Eyring Chemistry building #85. onstruction Constraints Occupied building. Other University projects within the building. Downtime for the elevator closure needs to be as short as possible with its duration. The schedule was built with estimated lead times which need to be confirmed by the elevator contractor. Elevator Contractor must minimize loud noises and disruption to building occupants and are to occur earlier or later in the workday when possible. The Bidders are to provide, as part of their Bid, confirmation of the schedule. Bidders are to provide milestone dates showing when the elevator work will commence and when contractors will occupy the Site and Building, and the duration. Provide elevator shut down and closure dates and duration. The HEB and U of U have other construction project activities throughout the building and will require coordination. The University of Utah reserves the right to reject any or all bids or to waive any formality or technicality in any bid in the interest of the University. Contract duration: One Time Purchase Contract renewal: Not Applicable Prices good for: 45 days Regions: Utah, Salt Lake

Post-Bid

Educational

$386,969.00

Public - State/Provincial

Renovation

9

13

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
66
Bidding Soon
1,055
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2021

December 2, 2021

Project location map

315 1400 E, Salt Lake City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.