Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 14, 2025 at 8:00 PM
Updated July 15, 2025
Demolition, site work, new construction, renovation and addition to a medical facility in Salt Lake City, Utah. Completed plans call for the addition of a medical facility; for the demolition of a medical facility; for the renovation of a medical facility; for site work for a medical facility; and for the construction of a 483,000-square-foot medical facility.
The University of Utah (U Facilities) intends to hire a Design/Build and CMGC/Architectural Team, referred to herein as "Team " comprised of a general contractor supported by subcontractors and an architect with supporting technical consultants to design and construct the following project: WEST VALLEY HEALTH CENTER AND HOSPITAL (PHASE 1A AND 1B) UNIVERSITY OF UTAH - WEST VALLEY CITY, UTAH Project estimated cost for Phase 1A: $300,000,000 Project estimated cost for Phase 1B: The project cost (FLCC- Fixed limit of Construction Cost) for Phase 1B will be determined at a later date. Teams will be required to submit a FLCC for Phase 1B during stage II of the selection process. Phase 1A of this project will provide approximately 483,000gsf of clinical, surgical, endoscopy, infusion, radiology, lab, pharmacy, and other critical support spaces. An Emergency Department and helipad are also included. Huntsman Cancer Institute will also have a presence for outpatient care. Phase 1A of this project requires comprehensive site design and master planning to accommodate the future Phase 1B expansion. Phase 1B will serve as an extension of the Phase 1A building, introducing new services, expanding key departments within Phase 1A, and adding support spaces essential for patient care. The intent is that the completed Phase 1A and 1B appear as a unified project rather than separate entities. Ensuring close adjacencies and strategic proximities between the phases is vital for connecting services, streamlining patient care pathways, maintaining continuity of care, and enhancing workflow efficiency for staff and providers. Final programmatic requirements for Phase 1B will be provided to shortlisted teams during Stage II of the RFP process at a later date. The selected Team will be responsible to design and construct Phase 1B, in coordination with University of Utah, within the established fixed limit of construction cost (FLCC). The University will issue a separate CMGC and Architectural contract for Phase 1B. For questions regarding this project, please contact the Project Manager Nirman Rajbhandari, University of Utah, at n.rajbhandari@utah.edu . No others are to be contacted regarding this project. A bid bond in the amount of five percent (5%) of the bid amount, made payable to the University of Utah on the AIA Document A310 - 2010 Bid Bond, or equivalent, shall accompany the cost proposal emailed to PDCContracts@utah.edu during Stage II. The University of Utah reserves the right to reject any or all proposals or to waive any formality or technicality in any proposal in the interest of the University.
Post-Bid
Medical
$300,000,000.00
Public - State/Provincial
Addition, Demolition, New Construction, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 16, 2024
January 5, 2026
3460 S 4155 W, Salt Lake City, UT
Related To This Project
Salt Lake City, UT
--
Salt Lake City, UT
Bid Date: Dec 20 2024
Salt Lake City, UT
--
Salt Lake City, UT
Bid Date: Dec 04 2024
Salt Lake City, UT
Bid Date: Dec 02 2024
Salt Lake City, UT
Bid Date: Dec 11 2024
Salt Lake City, UT
Bid Date: Dec 10 2024
Salt Lake City, UT
--
Salt Lake City, UT
Bid Date: Nov 19 2024
Salt Lake City, UT
Bid Date: Nov 19 2024
Salt Lake City, UT
Bid Date: Nov 02 2021
Salt Lake City, UT
Bid Date: Dec 17 2020
Salt Lake City, UT
Bid Date: Dec 17 2024
Salt Lake City, UT
Bid Date: Nov 26 2024
Salt Lake City, UT
Bid Date: Nov 27 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
