Site work for a sidewalk / parking lot in San Bruno, California. Completed plans call for site work for a sidewalk / parking lot.

The work includes, but is not limited to: demolishing existing concrete and asphalt, performing base repair, building new curb and gutter, curb ramps, and sidewalk, overlaying asphalt, striping parking lot, and building new trash enclosure within parking lot (including concrete pad and sewer with grease interceptor/water connection). All work items shall be constructed in accordance with the contract plans and specifications. Bidding Documents contain the full description of the Work. If approved by the City, construction equipment and materials may be stored within the public right-of-way but must be moved every five (5) days as construction progresses. Material storage at the construction site shall be limited to what is needed for five (5) days construction. No construction material shall be stored over the weekend unless approved by the City Engineer. Operating reflector barricades shall be required for all equipment and material left on the street overnight. At the end of each workday all loose material, parts and debris must be cleaned up and discarded and any stored materials shall be neatly stacked and organized. Failure to comply with these requirements shall result in liquidated damages in the amount of $250 per Calendar Day The construction site and any off-site staging areas must be secured by temporary chain linked fencing, with a minimum height of 72 inches, unless the building code requires additional protection. The chain link fence is to be made of galvanized steel and must include a top and bottom rail. The fencing must be adequately anchored to prevent movement and the effects of wind. No visible gaps in the fencing are allowed, including between panels or under them. Gates must be sliding or in-swinging and close tightly with no gaps in or around them. When the construction site or off-site staging area is adjacent to any public right-ofway, the fence adjacent to the right-of-way shall have a visual/dust barrier or screening. The screen is to be constructed of green knitted polyethylene or canvas securely fixed to the inside face of the fencing and shall be maintained in a taut condition throughout the project. No twisted wire is to protrude on the exterior side of the fence. No tears or rips greater than 2" in any dimension will be allowed. Any screening that is torn or ripped or fencing or barricades that have been defaced will be replaced at the contractor's expense within 48 hours. In addition to the required screening, any wood barricades or temporary chain link fencing facing a public roadway shall be setback two (2) feet from any property line or sidewalk, if site conditions allow. All areas visible from the public right-of-way shall be maintained free of weeds and litter. Any construction site or staging area fencing facing a public roadway shall include a sign, securely installed on the fence that is made of durable and waterproof materials that provides the following information: the name and emergency contact telephone number of the general contractor. The sign lettering shall be large enough to be read from 10 feet away and the sign shall not extend above the top of the fence. The sign language and graphics need to be approved by City staff prior to installation. Failure to comply with these requirements shall result in liquidated damages in the amount of $250 per Calendar Day. Each Bidder shall be required to submit, in accordance with Document 00 21 00 (Instructions to Bidders) and Document 00 45 13 (Statement of Qualifications (SOQ) for Construction Work), a Statement of Qualifications. All work under this contract shall be completed within 60 Working days from the Notice to Proceed effective date. The City shall assess liquidated damages in the amount of $500 per Working day for delays in completion of the project, as provided in the Contract Documents. Cash, cashier's check or certified check, payable to the order of the City of San Bruno, of not less than ten percent (10%) of the bid, or a bond in said amount payable to the City of San Bruno and signed by the Bidder and a corporate surety shall accompany the bid. A California Class "A" contractor's license is required to bid on this contract. Joint ventures must secure a joint venture license prior to award of this Contract. The successful bidder must comply with all prevailing wage laws applicable to the project, and related requirements contained in the contract documents.

Award

Sidewalks / Parking Lot

$349,528.00

Public - City

Site Work

15

16

16

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Quality Control, Testing Laboratory Services, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Existing Conditions, Common Work Results for Existing Conditions, Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Assembly and Testing Equipment, Applicators
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
119
Bidding Soon
1,922
All Active Projects
929
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2021

January 5, 2022

img_map_placeholder

Multiple Locations, San Bruno, CA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Senior Center Parking Lot Overlay and Trash Enclosure

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.