EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 18, 2021 at 7:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in East Dubuque, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

Bids will be received for two separate prime contracts as follows: The Contract A Water Tower project consists of the construction of a 200,000 gallon single pedestal water tower. The project also includes a main extension to the proposed water tower site. Included in the project is various site work associated with the proposed water tower site including earthwork, storm sewer, clearing and grubbing, HMA pavement, seeding, erosion control, etc. The Contract B Water Distribution Improvements project consists of the installation of approximately 1,750 LF of 8-inch water main and 380 LF of 6-inch water main and associated appurtenances including water services. The project includes the installation of a pressure control structure as well as the installation of 66 individual property PRVs. The project also includes the reconstruction of approximately four blocks of Desoto Street including 1100 tons of HMA pavement, 3750 tons of base stone, minor storm sewer improvements and sidewalk improvements. Electronic and/or printed copies of the bidders proposals, plans, specifications and contract documents prepared by Origin Design Co. Each bidder shall accompany its bid with bid security in the form of a bid bond, bank draft, cashier's check, or certified check payable to the City of East Dubuque for 5% of the total amount of the bid. Work on the improvement shall commence on or before the date specified in the written "Notice to Proceed" for each contract and the contracts shall be completed as follows: Contract A Water Tower - on or before May 20, 2023. Liquidated damages in the amount of $750.00 will be assessed for each day that the work shall remain uncompleted after the end of the completion date, with due allowance for extension of contract period due to conditions beyond the control of the Contractor, as approved by the Owner. Contract B Water Distribution Improvements - on or before October 7, 2022. Liquidated damages in the amount of $500.00 will be assessed for each day that the work shall remain uncompleted after the end of the substantial completion date, with due allowance for extension of contract period due to conditions beyond the control of the Contractor, as approved by the Owner. The improvements shall be kept and maintained in good repair for a period of two years after substantial completion is determined by the Engineer for Contract A Water Tower and Contract B Water Distribution Improvements. Any contracts awarded under this invitation for bids are expected to be funded in part by a loan from the Illinois Environmental Protection Agency (Illinois EPA). Neither the State of Illinois nor any of its departments, agencies, or employees is or will be a party to this invitation for bids or any resulting contract. The procurement will be subject to regulations contained in the Procedures for Issuing Loans from the Public Water Supply Loan Program (35IAC Part 662), the Davis-Bacon Act (40 USC 276a through 276a-5) as defined by the United States Department of Labor, the Employment of Illinois Workers on Public Works Act (30 ILCS 570), and the "Use of American Iron and Steel" requirements as contained in Section 436 of H.R. 3547, The Consolidated Appropriations Act, 2014. This procurement is also subject to the loan recipient's policy regarding the increased use of disadvantaged business enterprises. The loan recipient's policy requires all bidders to undertake specified affirmative efforts at least sixteen (16) days prior to bid opening. The policy is contained in the specifications. Bidders are also required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in 41 CFR 60-4. The contractors shall pay prevailing wages in accordance with the Federal Davis-Bacon wages provision. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the contract documents must be paid on the project, and that the contractors must ensure that employees and applicants or employment are not discriminated against because of race, color, religion, sex or national origin. Contractors must comply with the Drug Free Workplace Act (Source: P.A. 86-1459). BIDDERS will comply with Sec. 436 of H.R. 3547, "The Consolidated Appropriations Act, 2014", which specifies that all iron and steel products used in the project are produced in the United States. All contractors and subcontractors that work within the State of Illinois right-of-way are required to be prequalified with the IDOT. As issued by the Illinois Department of Labor, due to the high unemployment rate caused by the ongoing COVID-19 pandemic, the Employment of Illinois Workers on Public Works Act is in effect as of July 1, 2020. The state law requires the workforce on all public works projects to be comprised of a minimum of 90% Illinois residents. In an effort to comply with Disadvantaged Business Utilization and Affirmative Efforts, all bidders are required to advertise DBE subcontracting opportunities and to negotiate with disadvantaged businesses prior to bid opening. Failure to document such affirmative efforts shall be deemed, relative to disadvantaged business compliance, non-responsive. The advertisement must run one day at least 16 days prior to the bid opening. The advertisement requirements are included in the Illinois EPA Guidelines in Division 1 of the specifications. The bid totals will be available at and after the public bid opening. However, an itemized bid tabulation, if applicable, will not be publicly available until after the Owner awards the contract and funding agency award concurrence is obtained. The City of East Dubuque reserves the right to reject any or all Bids or to waive any informalities in the bidding. This invitation is given and published pursuant to authorization and direction of the City of East Dubuque. Terracon Project No. 07195100.01

Bid Results

Water / Sewer

$797,685.00

Public - City

Paving, Site Work

44

12

7

7

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roof and Wall Specialties and Accessories, Roof Accessories
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Key and Card Control Units
Division 12 - Furnishings

Division 12 - Furnishings

Art
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Air Distribution, HVAC Ducts and Casings, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Erosion and Sedimentation Controls, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
29
Bidding Soon
845
All Active Projects
322
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2021

December 16, 2021

img_map_placeholder

Multiple Locations, East Dubuque, IL

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Water System Improvements 2021 - Contract B Water Distribution Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.