BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, renovation and addition to a stadium in Madison, Wisconsin. Completed plans call for the addition of a stadium; for the renovation of a stadium; and for site work for a stadium.

This project is being let using a new single prime bidding and contracting process. DFD will publicly 24 bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. 25 Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in 26 each applicable MEP division of work. These successful MEP bids must be included in all general prime 27 contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will 28 publicly open general prime contractor bids. General prime contractor bids that do not include the 29 successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, 30 responsible, certified general prime contractor and this general prime contractor will enter into subcontracts 31 with the successful MEP bidders. In general, the work consists of a new, three story plus penthouse addition over a loading dock area. The new structure will provide additional space for strength and conditioning, sports medicine, academics, and administrative functions. Renovated space in the existing facility will allow for the expansion of locker rooms, media rooms, club rooms, and kitchen spaces. The new addition will be approximately 55,500 sq. ft. and the renovation will consist of approximately 41,000 sq. ft. Project scope includesselective demolition work, the construction of new partitions and the installation of all new finishes. The Work will also include modifications to the existing sprinkler system, plumbing system, HVAC system, and electrical system. Bid Results: Fire Suppression Hooper Corporation-462,649.00 Electrical Robert J. Nickles, Inc. dba Nickles Electric-6,535,895.00 Combined Based Bid: Plumbing Base Bid No. 3 and HVAC Base Bid No. 4 North American Mechanical, Inc.-4,376,000.00 As of October 31, 2023, this project is nearing completion.

Under Construction

Arenas / Stadiums

$11,374,544.00

Public - State/Provincial

Addition, Renovation, Site Work

428

39

111

9

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
50
Bidding Soon
965
All Active Projects
444
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2021

May 5, 2022

img_map_placeholder

601 W Dayton St, Madison, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.