BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of a civil project in Poway, California. Conceptual plans call for site work for a water / sewer project; and for the construction of a water / sewer project.

This project consists of a new Forebay Tank, Booster Pump Station, and 36-inch diameter treated water pipeline from the POW-5 Flow Control Facility to the Forebay Tank/Booster Pump Station and then to Poways Clearwell Bypass Pipeline. All questions about the Contract and technical portions of the RFP, must be submitted in writing by January 12,2022, by 4:00 p.m. to the Citys Representative as follows:City of Poway - Public Works Department Jessica Parks, Utilities Administrator Treated Water Facilities Project RFP No. 22-006 Phone: (858) 668-4703 Fax: (858) 668-1230 E-Mail: jparks@poway.org This Request for Proposal (RFP) is issued to invite qualified Consultants to submit proposals to provide professional engineering services for the design of the City of Poway's (City) Treated Water Facilities Project. A site map containing an overview of the project and the related San Diego County Water Authority (SDCWA) POW-5 Turnout and Flow Control Facility is presented in Figure 1. The project consists of the design and construction of the following project: Poway Treated Water Facilities, as shown in Figure 3: This project consists of a new Forebay Tank, Booster Pump Station, and 36-inch diameter treated water pipeline from the POW-5 Flow Control Facility to the Forebay Tank/Booster Pump Station and then to the Citys Clearwell Bypass Pipeline. Refer to the attached Preliminary Design Report for additional project information and requirements. The Forebay Tank, Booster Pump Station, and treated water pipeline will be owned and operated by the City. Excluded from this RFP is the design and construction of the following project: SDCWA POW-5 Turnout and Flow Control Facility, as shown in Figure 2: This project consists of a new SDCWA turnout service connection, a flow control facility near STA 413+00 (near the intersection of Espola Road & Green Valley Truck Trail) to the Ramona Pipeline and a 24-inch diameter lateral pipeline connecting the new turnout structure to the flow control facility. The aforementioned facilities will be owned and operated by the SDCWA. Refer to the attached Planning Study for supplemental project information for this project. The method of contractor selection has not been determined at this time.

Conceptual

Water / Sewer

$2,000,000.00

Public - City

New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
64
Bidding Soon
1,539
All Active Projects
673
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.