BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 12, 2021 at 7:00 PM

Updated January 26, 2024

Site work and paving for a civil project in Henderson, Colorado. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Brighton Road Bridge is located approximately 300 feet south of East 112th Ave over the Fulton Ditch. Located at Latitude 39 53'56.44", Longitude 104 52'50.65" The Bridge was built in 1941 and with a span of approximately 44 feet and a structure length of 50 feet. Bridge width is 33'9". An asphalt overlay with a concrete deck sit on top of steel girders with concrete bridge abutments. The project will consist of removal and replacement of existing bridge, paving of Brighton Road up through and including tying into East 112th Avenue. This bridge is over the Fulton Ditch and will require the prospective bidders to comply with any special requirements of the Fulton Ditch Company. General Requirements - Bid Deposit Required - Insurance Required Question Acceptance Deadline 10/08/2021 05:00 PM EDT This project has been awarded to Zak Dirt, Inc. in the amount of $1,906,827.72.

Award

Bridges / Tunnels

$1,906,827.00

Public - City

Paving, Site Work

91

3

5

Subscribe For Documents

103 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
101
Bidding Soon
1,339
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2021

November 15, 2021

Project location map

Brighton Rd, Henderson, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.