Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a bridge / tunnel in Albany, New York. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
https://www.bizjournals.com/albany/news/2023/02/23/elevate-albany-interstate-787.html And at the December announcement for the replacement of the Livingston Avenue Bridge between Albany and Rensselaer, the state's transportation commissioner, Marie Therese Dominguez, pointed to the governor's support for urban highway adaptation projects in Buffalo, Rochester and Syracuse. __________________ https://www.bizjournals.com/albany/news/2022/12/22/central-warehouse-new-ownership.html The railroad spur on the second floor, which is linked to the Livingston Avenue bridge over the Hudson River, will have a pedestrian walkway directly into the building as part of the upcoming $400 million refurbishment of the railroad bridge _________________ New York working on $400M Livingston Avenue bridge replacement New York - Plans to replace the Civil War-era Livingston Avenue Passenger Rail Bridge over the Hudson River are advancing through the state and federal review process. Built in 1865, the bridge connects Rensselaer and Albany by rail and provides a path for passenger rail service from New York City to Western New York. Deterioration of the current structure, leased to Amtrak, limits trains crossing to one at a time at speeds of 15 mph. The new bridge will accommodate improved passenger service. The current movable swing bridge would be replaced with a new lift-type bridge that would bring the structure up to modern standards for height, width, and speeds for passenger and freight trains and more reliably accommodate marine traffic using the Hudson River. The new bridge will be south of the existing bridge on a parallel alignment and would carry two railroad tracks. Approach track work will include improvements to the triangular junction of rail tracks on the Rensselaer side to facilitate train turning movements and the rehabilitation and reconfiguration of the rail bridges over Water and Centre streets on the Albany side. The new bridge also will include a separated shared use path connecting to the Albany Skyway and Empire State Trail to the city of Rensselaer. Construction is estimated at $400 million and is slated to begin by the end of 2023. Completion of the new bridge is expected by the end of 2026. ________________________________________ Livingston Avenue Bridge over the Hudson River Subsurface Exploration for Soil, Rock and Environmental Samples The New York State Department of Transportation, acting through its agent Modjeski and Masters, Inc., is seeking to retain a qualified Contractor to provide geotechnical and environmental soil boring and sampling services within the location described above in the City of Albany and the City of Rensselaer, New York. The selected Contractor will be required to perform sampling for sixteen (16) geotechnical borings at designated locations within the project limits in accordance with the requirements of Standard Specifications, Construction and Materials, US Customary Units, issued by the New York State Department of Transportation Office of Engineering, latest edition, including all current amendments thereto. Ten (10) of the borings are located on water and Six (6) of the borings are located on land. The selected Contractor will also be required to perform three (3) cone penetrometer tests (CPT) adjacent to the land-located borings. All work will be performed under the full-time direction and observation of inspectors representing Modjeski and Masters, Inc. The Contract for which Proposals are being solicited herewith will be with Modjeski and Masters, Inc., who is the Prime Consultant on the Livingston Avenue Railroad Bridge over the Hudson River Project, is D030852. All work will be performed under the management of Modjeski and Masters, Inc. Federal prevailing wage rates apply to this Contract. 1. Location: Albany and Rensselaer Counties, New York, between the Cities of Albany and Rensselaer over the Hudson River. 2. Bond: Bid and Performance Bonding is not required for this Contract. 3. Insurance: Insurance requirements as listed below, but in accordance with the specifications in the Bid Documents: a. Commercial General Liability and Contractual Liability (also called Comprehensive). b. Automobile Liability c. Umbrella or Excess Liability d. Workers' Compensation and Employer's Liability Insurance e. Special Protective and Highway Liability f. Railroad Protective Liability (Amtrak) insurances required for Right-Of-Entry g. Marine Protection and Indemnity h. Pollution Liability i. All Sub-contractor's 4. Permits and commitments: Due to the presence of hazardous materials, including Polychlorinated Biphenyls (PCBs), metals, and chlorinated solvents, and endangered species, the contractor is responsible for complying with the following permits secured by the State: a. U.S. Army Corps of Engineers Nationwide Permit 6 "Survey Activities" b. New York State Department of Environmental Conservation Section 401 Water Quality Certification and Protection of Waters Permit c. New York State Department of State Coastal Zone Management Consistency Determination The Contractor is responsible for obtaining the following: a. Right-of-Entry Permit from Amtrak, including all insurances required by Amtrak . The Contractor shall include all subcontractors, the Drilling Inspectors and Qualified Environmental Professionals (QEPs) on the permits. b. Amtrak safety training for all personnel performing the drilling operations, including all subcontractors, Drilling Inspectors and QEPs. c. Submit a Local Notice to Mariners (LNM) form to the United States Coast Guard 2 weeks before in-river work is to begin. d. Must have a For-Profit Construction Questionnaire (CCA-2) on file with the Officeof the State Comptroller Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 0% Women Owned Sub-Contracting Goal: 0% Service-Disabled Veteran-Owned Business Contracting Goal: 0% Disadvantaged Owned Sub-Contracting Goal: 4.86%
Post-Bid
Bridges / Tunnels
$70,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 22, 2021
November 30, 2021
Livingston Ave, Albany, NY
Related To This Project
Albany, NY
Bid Date: May 09 2023
Albany, NY
Bid Date: Jun 28 2023
Albany, NY
Bid Date: Jul 21 2023
Albany, NY
Bid Date: Jun 13 2023
Albany, NY
Bid Date: Jul 06 2023
Albany, NY
Bid Date: Jul 06 2023
Albany, NY
--
Albany, NY
Bid Date: Jun 19 2023
Albany, NY
Bid Date: Jun 22 2023
Albany, NY
Bid Date: Aug 02 2023
Albany, NY
Bid Date: Jun 22 2023
Albany, NY
Bid Date: Jun 23 2023
Albany, NY
Bid Date: Jun 23 2023
Albany, NY
Bid Date: Jun 22 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.