BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a bridge / tunnel in Manchester, Iowa. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Project calls for repair work to be done on the West Marion Street Bridge. As of January 20, 2022, a design engineer has been selected. This project is waiting for grant funding approval to move forward. No firm timeline has been established for the construction.

Design

Bridges / Tunnels

$1,200,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
93
Bidding Soon
1,014
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2023

Project location map

W Marion St, Manchester, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.