BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and outdoor lighting for a civil project in Santa Clara, California. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

The City of Santa Clara (hereinafter "City") is soliciting bids from qualified vendors to provide all labor, materials, and equipment necessary to perform various traffic signal upgrades in support of the such as removal and replacement of signal controller cabinets, pan-tilt-zoom cameras, ethernet switches, accessible pedestrian signals, category 6 and coaxial cables, two (2) push button posts and foundations, and removing and replacing one Type P foundation in support of the Department of Public Works Traffic Division. ESTIMATED QUANTITIES/SERVICE LEVELS: The quantities/service levels specified herein are the City's best estimate of the quantities/service levels that will be purchased; however, they are not guaranteed. Any variations from these estimated quantities/service levels shall not entitle the bidder to an adjustment in unit pricing or rates. Contract duration: 1 year Bid Result : 1. - Furnish and Install Travel Time Reader Antenna and Field Unit Processor - Econolite Systems, Inc. - $37,871.00 2. - Furnish and Install Coax Cable - Bear Electrical Solutions, Inc - $6,160.00 3. - Remove and Replace Type P Cabinet - Bear Electrical Solutions, Inc - $21,950.00 4. - Furnish and Install 2070 Controller Unit in Cabinet - Econolite Systems, Inc. - $44,307.00 5. - Furnish and Install APS Central Unit in Cabinet - Econolite Systems, Inc. - $10,837.00 6. - Furnish/Install Ethernet Switch in Cabinet - Econolite Systems, Inc. - $152,639.00 7. - Furnish and Install PTZ Camera on Pole - Alfaro Communications Construction,Inc. - $162,750.00 8. - Furnish and Install Category 6 Cable - Alfaro Communications Construction,Inc. - $25,000.00 9. - Removal of Push Button and Replace with APS Button - Econolite Systems, Inc. - $20,971.00

Bid Results

Roads / Highways

$482,485.00

Public - City

Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
73
Bidding Soon
1,484
All Active Projects
641
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 28, 2021

November 29, 2021

img_map_placeholder

Multiple Locations, Santa Clara, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.