Site work for a water / sewer project in Tuscaloosa, Alabama. Completed plans call for site work for a water / sewer project.

The Project shall be known as Hilliard N. Fletcher Water Resource Recovery Facility (HFWRRF) Raw Sewage Pump Station (RSPS) Improvements and the general character of said public works project shall consist of the following: This project consists of selective demolition, rehabilitation, and improvements to the existing raw sewage pump station at the Hilliard N. Fletcher WRRF including demolition of existing pump discharge isolation valves, installation of insertion valves to serve as new pump isolation valves, rehabilitation of the existing pump discharge piping segments through removal of the existing protective coating system and reapplication of a new protective coating system, replacement of existing variable frequency drives for all raw sewage pumps, modifications to the existing electrical building to meet current electrical code requirements, replacement of the existing RSPS control panel, and other miscellaneous electrical improvements in the vicinity of and associated with the raw sewage pump station. The contact person for the project is Wes Cardwell, PE, Project Manager. They can be reached at (256) 534-5512 or by email at RWCardwell@GarverUSA.com. Each bidder must submit with its bid a cashier's check drawn on an Alabama bank or a fully executed bid bond on the form that is contained in the Contract Documents executed by a surety company duly authorized and qualified to make bond in the State of Alabama. All bonds, sureties and/or cashier checks will be made payable to the City for an amount not less than 5 percent of the City's or its engineers or architects estimated cost of the Project or of the total bid in the proposal, but in no event more than $10,000.00. Award of the contract will be made within forty-five (45) calendar days from the date of the bid opening. The project has a goal of ten to twenty percent (10-20%) MBE/DBE/WBE participation. Budget is approximately $1.0 – 1.2M for this project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$1,200,000.00

Public - City

Site Work

15

17

10

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
33
Bidding Soon
557
All Active Projects
229
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2021

December 20, 2021

img_map_placeholder

Multiple Locations, Tuscaloosa, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.