BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Turtle Creek, Pennsylvania. Completed plans call for site work for a water / sewer project.

Bid Bond Amount: 10% All excavation shall be unclassified and no extra payment will be made for rock, boulders, shale, timbers, logs, old foundations, masonry or other natural or artificial materials encountered in the trenching operations except for those underground structures defined in Section 2.3B, Paragraph 1.02. The Contractor shall make personal examination of the locations in which the pipelines are to be constructed to determine for himself the extent and of the rock that may be encountered. The Contractor acknowledges there may not be sufficient time to perform pre-bid borings to determine the nature of the subsurface conditions and that the Contractor may have to rely on its visual inspection of the site when making a determination as to the character of the subsurface conditions. No information regarding subsurface conditions along the routes of the pipelines will be given by the owner. The Contractor shall assume ail risks associated with the composition of the subsurface materials and the ease or difficulty of excavation. The Contractor shall not at any time claim a misunderstanding regarding the depth or character of the excavation to be made or in the nature of the materials to be encountered. The Contractor shall perform his own independent investigation of field conditions, including the drilling of test borings or other investigation, as he may deem necessary to perform this work. Any associated costs for test borings or other required investigation should be included in the Contractor's Unit Price Bids for pipe. SOIL EROSION AND SEDIMENTATION CONTROL MEASURES The Contractor shall perform all required Soil Erosion and Sedimentation Control measures as defined on the Contract Drawings and in accordance with PA Clean Stream Law (35 P.S. -- 691.1001) and regulations at 25 PA Code Chapter 102. The Contractor shall notify the Allegheny County Conservation District (A.C.C.D) at least seven (7) calendar days before construction of his intent to begin.

Award

Water / Sewer

$114,310.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
35
Bidding Soon
760
All Active Projects
299
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2021

November 18, 2021

img_map_placeholder

George St, Turtle Creek, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.