Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Turtle Creek, Pennsylvania. Completed plans call for site work for a water / sewer project.
Bid Bond Amount: 10% All excavation shall be unclassified and no extra payment will be made for rock, boulders, shale, timbers, logs, old foundations, masonry or other natural or artificial materials encountered in the trenching operations except for those underground structures defined in Section 2.3B, Paragraph 1.02. The Contractor shall make personal examination of the locations in which the pipelines are to be constructed to determine for himself the extent and of the rock that may be encountered. The Contractor acknowledges there may not be sufficient time to perform pre-bid borings to determine the nature of the subsurface conditions and that the Contractor may have to rely on its visual inspection of the site when making a determination as to the character of the subsurface conditions. No information regarding subsurface conditions along the routes of the pipelines will be given by the owner. The Contractor shall assume ail risks associated with the composition of the subsurface materials and the ease or difficulty of excavation. The Contractor shall not at any time claim a misunderstanding regarding the depth or character of the excavation to be made or in the nature of the materials to be encountered. The Contractor shall perform his own independent investigation of field conditions, including the drilling of test borings or other investigation, as he may deem necessary to perform this work. Any associated costs for test borings or other required investigation should be included in the Contractor's Unit Price Bids for pipe. SOIL EROSION AND SEDIMENTATION CONTROL MEASURES The Contractor shall perform all required Soil Erosion and Sedimentation Control measures as defined on the Contract Drawings and in accordance with PA Clean Stream Law (35 P.S. -- 691.1001) and regulations at 25 PA Code Chapter 102. The Contractor shall notify the Allegheny County Conservation District (A.C.C.D) at least seven (7) calendar days before construction of his intent to begin.
Award
Water / Sewer
$114,310.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 18, 2021
November 18, 2021
George St, Turtle Creek, PA
Related To This Project
Turtle Creek, PA
Bid Date: Apr 12 2022
Turtle Creek, PA
Bid Date: May 31 2022
Turtle Creek, PA
Bid Date: Apr 04 2022
Turtle Creek, PA
Bid Date: Apr 04 2022
Turtle Creek, PA
Bid Date: Aug 01 2022
Turtle Creek, PA
--
Turtle Creek, PA
Bid Date: Jan 27 2022
Turtle Creek, PA
Bid Date: Apr 03 2023
Turtle Creek, PA
Bid Date: Apr 21 2022
Turtle Creek, PA
Bid Date: Oct 24 2022
Turtle Creek, PA
Bid Date: Nov 28 2022
North Scranton, PA
Bid Date: Apr 28 2022
Media, PA
Bid Date: Jul 05 2022
Nanticoke, PA
Bid Date: Jun 23 2022
New Stanton, PA
Bid Date: May 12 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.