Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and new construction of a mixed-use development in Riverside, California. Conceptual plans call for the demolition of a warehouse / distribution facility; for the construction of a warehouse / distribution facility; and for site work for a warehouse / distribution facility.
This project is for Warehouse and Storage Building Replacement. Currently, the Water Quality Control Plant (WQCP) is using two old concrete digesters that were built in the 1940s that were converted to a warehouse more than thirty years ago. Also, there exists no storage cover to protect the WQCP and Collection System portable pumps, generators, equipment, and materials, and they are susceptible to outside elements. The WQCP and Collections Section will need a combined warehouse and storage facility. Project is included in the City of Riverside's FY 2022 - 2027 CIP. As of August 25, 2022, information regarding a design team or a general contractor is not available. Design is anticipated to begin in the winter of 2022 and construction is anticipated to begin in FY 2029/2023.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Warehouse / Distribution
$1,700,000.00
Public - City
Demolition, New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2029
5950 Acorn St, Riverside, CA
Related To This Project
Riverside, CA
--
Riverside, CA
--
Riverside, CA
Bid Date: Aug 31 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.